Laserfiche WebLink
. a <br /> !un bate: 1'1/9/201:6' City.of Everett-Public.Works.'Department Cutoff'Date: 10/21/2046 <br /> Time: 10:33'AM, Contract Estimate Voucher <br /> • Project: '320 For 'Work;order 6.5ch A Contractor:' RUCTIO <br /> •KLB.CONSTRUCTION;N; <br /> EAST GRAND'SE-,WER.FtEPLACEMENrI Estirrtate:#1i8 PO.pox 158 <br /> • <br /> &STORM SEPARATI,e,N,WO:•UP 3398, <br /> PHASE B-1 ' <br /> • <br /> ' WO,Seh,A BID:$2,,173,665:35. MUIiILTEO, WA'98275 <br /> • , .TOTAL BID:$6,1'51:,331.1,5 .. <br /> Unit Plan • Total Previous Present • Total Previous Present <br /> tem 0' 'bescription Units Price. Quantity Quantity Quantity Quantity Amount Amount Amount <br /> )028 Replace Exlsting;Water•'S.ervice,'3/4-Inch, EA 2;.800.00 4;00 •0,0000 0.0000 (.0000 0:00 • '0;00 • 0.00 <br /> 1029 Servlce.Connectl'on.3/4-Inch lila, EA 3,400.00 1.00 0,0000 0.0000 '0,0080 0.00 0,00 0,00 <br /> )030 'Reconnect.Eiflsting•H idrent EA 3,560;00 1,00. 3,0000 $,0000 0;9000 10,500.00 1.0,500.00 0,00. <br /> 1031 Sariltery Sewer Pipe,8-Inch'Die. LF •9$.55 145:00 396.0000 395.0000. .0.0000 '3E0217:25 38,927:25 0.00 <br /> - <br /> )032 Sariitary'Sewer Pipe,12-Inch Dia, LF 134.20 931.00 602,5000' 692..6000 0.0000 92,933.50 92,933,50 0.00 <br /> )033 Sanitary Sewer Pipe,18-Inch Dia. LF 205.75 540:00 698.0000 698.0000 0.0000 143,613.50 143,613.50 0.00 <br /> )034 Side Sewer Connection EA •5;400.00 12.00 11.0000 1.1.0000 0.0000 59,400,00 69,400.00 0.00 <br /> )038 Side Sewer Connect&inspect(2 way-clean EA. 5,500.00 31.00 28,0000 28.0000 0.0000 154,000.00 1.54,000,00 0.00 <br /> out) <br /> 1036 Temp Bypass Pumping LS 56;000,00 1.00 1.0000 1.0000 0.0000 56,000.00 66,000.00 0,00 <br /> )037 Sewer,12-inch Dia.HDPE DR 17(Pipe Burst) LF 115.00 1,178,00 1,179.0000 1,179.0000 • 0.0000 135,685,00 135,585,00 0.00 <br /> )038 Sewer,18-Inch Dia.HDPE DR 17(Pipe Burst) LF 136.00 1,356.00 1,217.0000 1,217.0000 0.0000 164,295,00 164,295,00 0,00 <br /> 1039 Temp Sediment&Erosion Control LS 6,000.00 1.0.0 1.0000 1.0000 0.0000 6,.000.00 6,00.0.00 • 0,00 ' <br /> )040 Topsoil Type A CY 36.00 140.00 0,0000 0.0000 0,0000 0.00 0.00 0.00 <br /> )041 Sod installation SY 435 980.00 0.0000 0.0000 0,0000, 0.00 0.00 0.00 <br /> )042 Cement Concrete Curb&Gutter,Type A-1 LF 19.60 3,570.00 3,562,0000 '3,562.0000 0.0000 69,815.20 .69,815.20 0.00 <br /> )043 CC Sidewalk,Driveway&Alley Approaoh,6- SY 45,80 290.00 358,5000 368.5000 0.0000 16,419.30 1.6,419.30 0.00. <br /> Inch <br /> 1044 Survey Monuments EA 600.00 2.00 2.0000 2:0000 0.0000 1,200.00 1,200.00 0:00 <br /> 1045 • Cement Concrete Sidewalk,4-Inch SY 28.35 1,190.00 1,337.0000 1,337.0000 0,0000 37,903,95 37,903.95 . 0,00 <br /> )046 Cement Concrete Curb Ramp,Type A or B EA 1,238.00 12.00 15,0000 15.0000 0.0000 18,570.00 18,570.00 0.00 <br /> )047 Cement Concrete Curb Ramp,Type C or D EA 1,238,00 3.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> )048 Permanent'Signing LS 2,250,00 1.00 . 1.0000 1.0000 0.0000 2,250,00 2,250.00' 0.00 <br /> 1049 Pavement Marking LS 1,050.00 1.00 1.0000 1.0000 0.0000 1,050,00 1,050.00 0.00 <br /> )050 Temp Pavement Marking LF 0.50 2,000.00 0.0000 0,0000 0.0000 0.00 0.00 0.00 <br /> 1051 Materials on Hand • DOLLA 1,00 60,797.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 1052 Cedar•Grove Compost Topsoil&Hand Seed CY 54.00 140.00 124.0000 124.0000 0.0000 6,696,00 6,696,00 0.00 <br /> 1053 Abandon Existing Monitoring Well EA 1,800,00 3.00 3.0000 3.0000 0.0000 5,400,00 5,400.00 0.00 <br />