My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/05/10 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/05/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2017 11:44:02 AM
Creation date
8/23/2017 11:43:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> PROJECT TITLE: <br /> Final Acceptance and Briefing COUNCIL BILL# <br /> Certification of Completion Proposed Action Originating Department Public Works <br /> with IMCO General Consent Contact Person John Nottingham <br /> Construction,Inc.,for the X Action Phone Number 425-257-8872 <br /> Water Pollution Control First Reading FOR AGENDA OF May 10, 2017 <br /> Facility Expansion Phase Cl Second Reading <br /> Third Reading <br /> Public Hearing Initialed by: <br /> Budget Advisory Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Smith Island Pre-Construction Services Contract 10/30/12 Final Contract Voucher Public Works <br /> General Contractor/Construction Management Certification, Certificate of <br /> Contract: 02/24/14 Completion,Final Estimate <br /> Amended General Contractor/Construction and Vicinity Map <br /> Management Contract: 04/09/14 <br /> Amount Budgeted $31,312,618 Account Number: WO#UP 3412 <br /> Expenditure Required -0- <br /> Budget Remaining $7,615,515 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The General Contractor/Construction Management Contractor,IMCO General Construction Inc. completed <br /> the Water Pollution Control Facility Expansion Phase Cl in accordance with the plans and specifications and <br /> to the satisfaction of the Public Works Department. The approved total maximum amount for the <br /> construction of this project, including contingencies,was $31,312,618,which includes Washington State <br /> sales tax. <br /> The amounts paid to the contractor under this contract are as follows: <br /> • Contract total paid to date exclusive of tax: $21,700,644.05 <br /> • Washington State sales tax paid to date: $1,996,459.25 <br /> • Total $23,697,103.30 <br /> • Bond was provided in lieu of retainage <br /> RECOMMENDATION (Exact action requested of Council): <br /> Accept the Water Pollution Control Facility Expansion Phase Cl as complete and authorize the Mayor to <br /> sign the Certificate of Completion with IMCO General Construction, Inc., allowing the release of the <br /> retainage bond. <br /> 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.