My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1007 HOYT AVE 2017-08-23
>
Address Records
>
HOYT AVE
>
1007
>
1007 HOYT AVE 2017-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2017 2:14:27 PM
Creation date
8/23/2017 2:14:00 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NON-CONFORMING BUILDING <br /> NCB 4 15-002 <br /> PLANNING DIRECIC7OR DECISION <br /> Applicant: Geoffiey Grice <br /> Address: 1007 Hoyt Avenue <br /> Everett,WA 98201 <br /> Site Address: 1007 Hoyt Avenue <br /> Legal Description: BAILEYS ADD TO EVERETT BLK 216 LOTS 13& 14 LESS E 52FT OF S 2 3/4FT OF <br /> LOT 13 <br /> `Fax Parcell 9: 00385421601300 <br /> Zoning: R-2, Single Family Detached Medium Density <br /> Lot Area: —5,857 square feet <br /> Single Family Dwelling <br /> Development Standards Re uiredLIxistinnd <br /> North Side Setback' 5' 3'-2° <br /> Detached Garage <br /> Development Standards Required Existing <br /> North Side Setback` 5' 1'-6" <br /> Decision: I hereby find that the above described non-conformities are APPROVED and were <br /> established prior to zoning code regulations for the subject property. This certification is subject to <br /> revocation if it is found that the information upon which it is based is erroneous. <br /> Date <br /> Allan G' , Director <br /> .s is an administrative decision appealable to the City's Land&Hearing Examiner. If you have <br /> questions regarding this approval or wish to file an appeal,please contact Teresa Weldon, City of <br /> Everett Planning Deparhnent,at 425-257-8731. <br /> Subsection 38.040.0 of the City of Everett Zoning Code requires that a building permit application be <br /> submitted within one year of the demolition of any structure in order to rebuild at the same <br /> nonconforming setback building line. <br /> 'EMC 19.06 Development Standards Table 6.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.