My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 W MUKILTEO BLVD 2017-08-24
>
Address Records
>
W MUKILTEO BLVD
>
215
>
215 W MUKILTEO BLVD 2017-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 11:31:38 AM
Creation date
8/24/2017 11:31:09 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC 0 S llE PARRTMENTMAIO) MAS COPY <br /> Utilities Division,3200 Cedar Street U <br /> ' ���Everett WA 98201 425-257-8800 <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $2660.00 Service Order# <br /> Contact Person Dale Woodard Telephone# 425 508-3079 <br /> Requested By Kirk Brooks Date of Request 9-7-2016 <br /> Property Owner(name) Our Saviors Lutheran Church <br /> Charge Cost to(name if different than owner) Dale Woodard/Olympic General Contractors <br /> Address 2110 Madison St City Everett, WA Zip 98203 <br /> Installation Location 215 W Mukilteo Blvd <br /> Installation type/description/size/etc. 6" tap and install 6" gate vale for contractor installed <br /> fire service. Estimate is for contractor to excavate, shore and restore. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required staflalkion <br /> date to allow for scheduling and parts procurement <br /> 6;.J i=j'r <br /> 3.. �. r` <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material'�qurp mejtrental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was m,:;de and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person apptpng ro he <br /> 4.14 <br /> installation. —`• i <br /> rb� , <br /> g r::7 <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. � a <br /> WATER METERS 3"'AND LARGER MAY HAVE A SIX TO 10 WEEK LIP ITME. <br /> LTI <br /> Material $1541.00 cc: Bldg.Permit Center — H) <br /> Mark Sadler <br /> Labor and Benefits $713.00 Matt Welborn <br /> Equipment Rental $279.00 Randy Allen <br /> Paul McKee <br /> Tax $127.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $2660.00 Benyam Stephanos <br /> Prepared by: ---,Jim S ooneX/' Date Estimate Prepared 9/22/2016 <br /> Accepted by: l -Representing <br /> STIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\215 W Mukilteo Blvd CEFP <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.