Laserfiche WebLink
Kirk Brooks <br /> From: Jane Zimmerman <br /> Sent: Monday, August 24, 2015 9:24 AM <br /> To: Benyam Stephanos <br /> Cc: Kirk Brooks <br /> Subject: 215 W Mukilteo Blvd, PW 1508-002 <br /> Hi Benyam— <br /> According to the information provided,this project will create more than 2,000 square feet of new plus replaced <br /> impervious surface. Therefore, the project must comply with Minimum Technical Requirements#1-5 in the City's 2010 <br /> Stormwater Management Manual. In this particular case, the new roof is proposed to drain onto the existing roof, <br /> which has a perimeter gutter system that connects to the underground drainage system. In order to meet the City's <br /> stormwater management requirements for this project, portions of this existing perimeter gutter system must be <br /> interrupted, and instead discharged to downspouts that daylight above ground. This disconnection from the <br /> underground drainage system is required wherever feasible without causing erosion or flooding. At the very least, it <br /> would appear feasible for the gutters along the south and east portion of the southern-most building to be disconnected <br /> from the underground system—please see the map below. <br /> Thank you, <br /> Jane <br /> Jane Zimmerman, Sr. Engineer <br /> City of Everett Public Works Department e / <br /> phone: 425-257-8885 fax: 425-257-8882 / <br /> e-mail:izimmerman@everettwa.g ✓ov �v 0,) AQ Ve <br /> fh� �;Ce ovr 4'/s <br /> K�rk <br />