Laserfiche WebLink
INSPECTION REPORT � �- <br /> Date: E;j�ZJILP Permit: jjl r-36 —(C5 <br /> Contractor:�pl <br /> Owner: r4t �OIV�dY ff hera� <br /> Site Address: -2[ V\1 �1 1 l'� N <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In structural Slab ❑OK to insulate El OK to insulate <br /> ❑Service ramEl Rooftop Units Water Service <br /> ❑Grounding Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Buildinq Fen: ❑ as ipe Final ❑,QHWT Final <br /> OTHER OR CONSULTATION: <br /> �� u <br /> ❑ APPROVALARTIAL APPRO L FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> G <br /> Inspector: Date: <br /> EIR(4/09) _ oanas s r. nNc.425/488-11900 <br />