Laserfiche WebLink
COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 02/28/2017 <br /> Work Order # <br /> Service Order # <br /> Contact Person 06—V r, Telephone #706-621-8798 <br /> Requested By <br /> Property Owner (Name) Danny &Virginia Loevenich <br /> Address: 2009 Rucker Ave. City Everett Zip 98201 <br /> Installation Location same <br /> Installation type/description Sidewalk; 50' X 8' X 4" = 5 cu xd of concrete <br /> The following estimate is based upon the Street Division work group providing all labor and equipment. <br /> Itemized Cost Estimate: <br /> Labor & Benefits 0 <br /> Material concrete; 5 cu. yd. () $98.50 per cu. yd. <br /> Equipment Rental 0 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TOTAL 492.50 <br /> Y <br /> Prepared by: Bob,,Sor en / ' / f� Date Estimate Prepared: 02/28/2017 <br /> P <br /> i I Y/X/ <br /> Accepted by: epresenting: '` "- <br /> (Signature) <br /> Please sign and return estimate to address above, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Estimate Only <br /> DO NOT SEND CHECK <br /> C:\Users\BSORGEN\Documents\Sidewalk Estimates\1Sidewalk!CUST ESP1N1ATE 6HEETl.docx <br />