Laserfiche WebLink
COST ESTIMATE SHEET EQ C DSRD <br /> Public Works Department MAR 0 8 2017 <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 PUBLIC WORKS <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 02/03/2017 <br /> Work Order # <br /> Service Order # <br /> Contact Person Steve Teel Telephone #(206) 963-7443 <br /> Requested By <br /> Property Owner (Name) Beverly Scheller Revocable Living Trust <br /> Address: Po Box 95 City Mukilteo Zip 98275 <br /> Installation Location �-2 G' 12« c <br /> Installation type/description Sidewalk: 67' X 8' X 4" = 6.75 cu. yd. <br /> The following estimate is based upon the Street Division work group providing all labor and equipment. <br /> Itemized Cost Estimate: <br /> Labor & Benefits 0 <br /> Material concrete: 6.75 cu. yd. (a) $98.50 per cu. yd. <br /> Equipment Rental 0 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TOTAL 664.87 <br /> Prepared by: Bob Sorgen Date Estimate Prepared: 02/03/2017 <br /> Accepted by: v a e Representing: <br /> (Signature) <br /> Please sign and return estimate to address above, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> � � � Estes ate <br /> �- <br /> ONO�STEND�CHE <br /> C:\Users\BSORGEN\Documents\Sidewalk Estimates\2013 RuckerCOST ESTIMATE SHEETI.docx <br />