Laserfiche WebLink
B. Install concrete curb and gutter and off-street parking on 24th <br /> Street from Walnut to State Street as outlined in the Garfield Park <br /> Master Plan <br /> Estimated Project Cost $27,800 <br /> C. Replace broken sidewalk as needed on the east side of Walnut from <br /> 20th to 22nd Street <br /> Estimated Project Cost 5,000 <br /> D. Replace approximately 165 feet of sidewalk and construct a drainage <br /> system to intercept ground water flow on the west side of Maple from <br /> 19th Street to Victor Place <br /> Estimated Project Cost 4,700 <br /> E. Allocate funds to the Council for a Greater Everett to provide support <br /> services to the Riverside Neighborhood <br /> Funds To be Allocated 1,000 <br /> F. Replace sidewalk segment in front of 2401 and 2405 Virginia. <br /> Estimated Project Cost 1,100 <br /> G. Replace sidewalk segment in front of 2414 Baker <br /> Estimated Project Cost 550 <br /> H. Replace sidewalk segment in front of 2524 Maple <br /> Estimated Project Cost 900 <br /> 2. The Mayor be instructed to have a Plans and Systems Ordinance prepared <br /> and presented to the City Council which will officially authorize and fund <br /> the development of contract plans, specifications and detailed cost <br /> estimates and the future construction of the above improvements. <br /> 3. Should costs be less for the above projects than was originally estimated, <br /> projects receiving the next highest neighborhood priority shall be included <br /> for funding. If project costs exceed the estimates given, the lowest priority <br /> project or projects shall be dropped. <br /> Councilman Introducing • solution <br /> Passed and Approved this d day of 1 , 1981. <br /> ' 4-adiN__ <br /> C► nci'resident <br /> - 2 - <br />