Laserfiche WebLink
INSPECTION REPORT <br /> Date Permit: <br /> Contractor: <br /> Owner: _'v ( d�✓l <br /> Site Address: ZS_l(p <br /> TYPE OF INSPECT& REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In Slab E]OK to insulate E]OK to insulate <br /> ❑Service ing ❑Rooftop Units ❑Water Service <br /> ❑Groundingnsu a ion ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid y�a�alLAlailiug� ❑Plumbing Final <br /> ❑Electrical Final hear Nailing GAS PIPE <br /> SITE WORK ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gass Pipe Final E]HWT Final <br /> OTHER O SULTATION: Q\_02-0 __ <br /> PPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ [:] F]OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ C FOR REINSPECTION—24 hour notice required <br /> P�L' ,J <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />