My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7811 19TH DR SE 2017-08-25
>
Address Records
>
19TH DR SE
>
7811
>
7811 19TH DR SE 2017-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 3:56:29 PM
Creation date
8/25/2017 3:56:19 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH DR SE
Street Number
7811
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: V_ 0(1�6 <br /> PUBLIC NORKS PERMIT 10 <br /> Public Works Permit#: PW1610-024 <br /> City of Everett Public Works Department <br /> E 3200 Cedar Street Parent Permit#: C1606-023 <br /> Everett, WA 98201 Planning Reference#: SUB14-003 <br /> (425) 257-8810 <br /> Public Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALPINE HEIGHTS DEVELOPMENT STEVE SNYDER <br /> 120 SW EVERETT MALL WAY ST100 120 SW EVERETT MALL WAY <br /> EVERETT WA 98204 EVERETT WA 98204 <br /> PHONE: PHONE: 3609532800 <br /> TAX PARCEL ID# SITE ADDRESS: 7811 19TH DR SE <br /> CONSTRUCT NEW TOWNHOUSE UNIT <br /> LOT 26 OF THE PLAT OF ALPINE HEIGHTS <br /> SITE WORK FOR BUILDING CONSTRUCTED IN APLINE HEIGHTS <br /> LOT 26 OF ALPINE HEIGHTS SUB14-003 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 � <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> n <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-3 9-7404 <br /> prior to starting construction and with other inspection requests.17) <br /> .']_ ._....; . . i,:__ :::"'a rye:;•"C'I r,�;p F--i i.7 <br /> 6. A sprinkler system is required for this building in compliance lithtfi 'ilsquiFements`tr'f�' <br /> NFPA Standards 13D. <br /> 7. Install erosion control measures as determined by the Public WPrks Inspector, such <br /> '> <br /> -:4-7assiltsilt fence, straw bales, swales, or erosion blankets. r19 <br /> - i_J <br /> 8. Connect side sewer per City Standard #'s 601 through 604. r. O <br /> 9. Connect rooftop downspouts to the drainage system provided fpr,this lot. <br /> 10.All excavated material from foundation, sidewalk, and drivew,oiy$ltlasall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this btaRWif�p 't -e4 ,,.� ; :t ' 'Z <br /> 11. No building materials to be stacked on sidewalk/roadway ad'd, idi aWkb i ' '• r711''C== <br /> be kept clean and open for pedestrian travel. <br /> G..T7 <br /> C".') <br /> 12. Driveway to Garage shall be paved. 4 Co 0 �..� <br /> 13 Site work to be done per plan approved on 10/18/2016. <br /> Public Works Fee Breakdown: § '4P _ p � p <br /> Plan Review$20.00 <br /> Inspection $20.00 CITY OF EVERETT <br /> Driveway $25.00 ACKNOVVL96b�MMi%t6�60NDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> m/8—1.6 causes of action that may arise because of installation and maintenance of the <br /> A roved for C struction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> p removes me upon noti ' from the City and to replace public property <br /> _ 1 D damage her y. <br /> FINAL INSPECTI N Date <br /> Approved as Constructed Signature of I Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.