KLB Construction Inc. 7/17/2017 Change Order 1
>
Contracts
>
Capital Contract
>
KLB Construction Inc. 7/17/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:17 AM
Creation date
8/28/2017 10:42:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc.
Approval Date
7/17/2017
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP3470-10
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000165
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction 6/22/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer System Replacement& Capacity Improvements Sewer"M" Phase II <br /> Change Order No. 1 <br /> Change Order Effective Date: 7/12/17 • <br /> CONTRACTOR <br /> By `--'li Date: 7 (t41-7 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order#1 is written to modify three existing bid items, two of which are on Schedule B and <br /> one on Schedule C of the project. <br /> Schedule B items modified: <br /> Bid item B19–Hot Mix Asphalt(HMA), Class B /HMA 'A-inch PG. Modify bid item B19 by <br /> adding 1,200 tons of Hot Mix Asphalt(HMA), Class B /HMA %-inch PG, at the unit price of$107.00 <br /> per ton, resulting in a$128,400.00 contract price increase. <br /> Bid item B20–Cement Concrete Pavement. Modify bid item B20 by adding 490 square yards of <br /> Cement Concrete Pavement, at the unit price of$270.00 per square yard, resulting in a $132,300.00 <br /> contract price increase. <br /> Schedule C items modified: <br /> Bid Item C-1 –CSO Weir Structure Modifications /Misc. Work Sheet C601. <br /> Modify bid item C-1 by deleting work on this bid item in its entirety, resulting in a $25,000.00 credit to <br /> the Contract. <br /> Net result of the above three modified bid items comes to a $235,700.00 contract price increase. <br /> JUSTIFICATION: <br /> Bid item B19,–Hot Mix Asphalt(HMA), Class B/HMA 'A-inch PG.Additional tons of Hot Mix <br /> Asphalt (HMA), Class B /HMA V2-inch PG were required to complete work on the project. <br /> Bid item B20–Cement Concrete Pavement. Additional square yards of Cement Concrete Pavement <br /> were required to complete work on the project. <br /> Bid Item C-1 –CSO Weir Structure Modifications/Misc.Work Sheet C601. Work on this bid <br /> item is being deleted as it assumed the Grand Avenue Bridge Project would be completed and <br /> associated storm pipes to carry flows from this CSO Weir Structure. <br /> CONTRACT TIME: No additional working days are being added by this change order#1. <br /> Page 3 of 3 <br />