Laserfiche WebLink
.,.+Frt. .r .� � e.� a � } ae ,�,7}. e i�•';. t.. .J.�� S�v�t �-t.� r�t.�r �i�},�1: �� , <br /> "*` �� ������c I���..1� � � ['0 �� i� � c/ r ..1 [f��" � .�, ,.,�! ° r <br /> •CUAII�LIANCL r I��J !�1 �yr�� ��N/��1'� J—����� �t��" f i hs�a.� rr� <br /> � fl[OUIIICO � n�'�in'fN `T�7 �7 .win qr'xy� .r'�r ,� �, Y0 ✓� _ �yi7' r � �.�„w rf�t �, �,�^i� �� <br /> +'� "d .''y,g �1 r���, rt h1�l0ehBS1UtGD �I�hC'Ti(C,�'�.7(1f1�1f �r .: � 'r�e �r�'w�4"�� ���� 'p`- <br /> ;eR��.���CC tl��,`.'7r:G:�!'f"-.Y_,:���.`1' ,MYo�Jgi.i.'4 YSYY'd� � �xLti fi. � 1 nr:�+.��.i.. .ro ..4.�� �? �Y;.,'iJ' <br /> msr�cnonn ��,�pORTANT: Dlsrepnrd lupic�Ihnt don'1 descrlue yaur bulldlnp or eq�dpment. 001�0T <br /> rrqov[o ���ce checks In the Iwo teft columns. <br /> � <br /> . i <br /> . : . <br /> r7 p Alrflow Irom habilable rooms lo whole-house lan ensured by undercul doors or grills (VIAO, S.302.G.4) <br /> O O Q Looscllll Insulatlon OK il(5.502.1.4.5�: <br /> Omauimum coiling slope:�3 in 12 <br /> � JO'ol clear distance Irom lop ol bollom cnord to uncferside of ronl sheathing at Iho rool ridg3. <br /> O O mll block polyethylene ground cover, tapped 12' at joirns and Io loundation wall <br /> O O � learancos shall mccl iisted rninimums between insulation and (S.502.1.•S.2): <br /> p chimney ❑ Non•IC rated recessed l ig hls: t/2"t o combustables, 3"to insulalion. <br /> O � ttic hetch shall be insulated to required ceiling R•valuo and is weather,tripped (5.502.1.A.4) <br /> O � ttic access shall have wood dam or equivalenl to ralain loose lill insulation in attic(S. 502.1.a) <br /> O p II exterlor doors (excepl 20 minute doors) shall be weatherstrfpped (S. 502.4.4). <br /> p ❑ rvlce hot&cold water plping shalt be insulated to fi•3 (S. 503.11) <br /> ❑ p rvlco reclrculatlon hot waler plpinp shall be insulated to Table 5-�2 <br /> O ❑ s hermoslat providod for each HVAC system w8h range ol 55•75' F.(heating) (S.503.0.1). <br /> O O o Reedlly eccesslble,uutor.iatic or Manual means provided to restrict or shutoll Heating input to each <br /> zone or Iloor during periods no� requirein„ heat(S. 503.8.3.1�. <br /> O ❑ i Controls lur backup heal prohibit similtaneousoperation ol Ihe primary system (S. 503.2.2(2�). <br /> O � hanlcal ventllallon systc;n shall have timer,dehumidistat, or swilch (S. 302.3.1). <br /> � O hanlcul ventllatl�n ducts shall have insulation 2 R•4 in uncondi�ioned spaces(VIAO,S.302.5) <br /> O O Mechanlcal supply ducts in conditioned spaces shall have a R•4 insulation (VIAO,S. 302.5) <br /> O O s upply ducts shall have volume dampers, or the equivalent,to balance system(S. 503.6). <br /> O O Supply end return aly ducts shall havo sealed duct joints in unconditioned spaces (S. 503.10.2�. <br /> O O � HVAC plenums, supply,and return ely ducts shall have R•0 fnsulalion(Table 5•11,All options) <br /> ❑ O s Electrlc water heater(s) shall have(S. 504.3) : <br /> �soparatc power, or pas shut�off j� t907 NAECA Lable on tank <br /> p noncompressible R10 pad (unheated spaces only) �iem,erature setling ; 120 F. <br /> p p howers end lavalorles shall limit Ilow to� 3.0 gallonsiminute (S. 504.�.t). <br /> p p o SwlmminA pool(s) (S. 504.5� shall have: <br /> ❑readily accessible ON/OFF swilch(pump, heater) ❑ Pool cover ❑ Piping insulaled to S.503.11 <br /> p p � Flreplece(s)(VIAO,S.402.3) shalt have: <br /> ❑ 6 square inch combustion air supplyduct wl operable damper,direciry conneded to ihe fire box <br /> ❑ Tight litling glass or metal doors;or Ilue dralt Induclion lan. O Ti;hi htting Ilue damper. <br /> O O ? Solld fuel burnlnp appllance(s)(VIAU, S.402.2)shall have: <br /> ❑ Tight litting glass or metal doors <br /> ❑ Oulside combustion air source dirr,ctly connected lo Ihe lire box <br /> ❑ F�ccaption:Non�direct, 4"diameter, dampered, combustion air source: allowed only lor(1) new slove <br /> installations in existing homes where obstructions preclude direcl combustion 2ir, or(2) Central <br /> heating syslems localed in unheated spaces. <br /> � O >> Three month,etclied Irack, radon monitor, printed instructions, and an inlormation sheet shalt be <br /> supplied by Ihe buildcr lo cach singte lamdy dwelling and to each ground Iloor unit ol multi-lamily dwellings <br /> (VI�Q, S. 502.2.1). <br /> WSEC. Fina!phase requirements: � <br /> �Inspected by:_._--- _Date <br /> ----- -- --- ---- - - ----- --- <br /> Pape G ol G <br />