Laserfiche WebLink
All storm drains in the complex must be stenciled with <br /> substantially tha following languaqe: "Dump no waste, <br /> dralns to wetland". This reminder is typically spray- <br /> painted on to the ground adjacent to the catch basin with <br /> the use of a stencil. The treatment needs to be repeated, <br /> approximately annually, when the paint wears off. The <br /> developer/owner may either perform the stenciling, or qive <br /> permission for volunteer groups to entar onto the property <br /> and perform the stenciling." <br /> e�t.evt�►TIONB <br /> D�t�ntions <br /> it appears that the applicant intends to pay to dra�.nage <br /> fund /340 instead of providinq on-slte detention. However, <br /> ✓ a completed City of Everett Drainage Calculation Form needs <br /> to be submitted to the City for review and approval, showing <br /> the required detention volume, to allow for calculation of <br /> the fee. <br /> / a�tcone: <br /> �M�mh��" volume isareached�durinqitheedesignastorm (6tmonthae24ghour <br /> �� ���� storm) , need to be submitted. <br /> �� � i(-��yl . <br /> ql <br /> � <br /> PLA_N RE\1I1EN COMMENTB <br /> r_ t o <br /> A planting schedule for the treatment area of the wetpond is <br /> /�/ �/ _ required for approval by the City. The plans need to call <br /> (/!�'� out the type of veqetation to be planted, the density of the <br /> � plantings, and the total number of plants needed. Plants <br /> suited to the depth of water ellow2irisatand/orrcattailslare <br /> be used. Hardstem bulrush, y <br /> appropriate in areas of the pond with 1-2 feet of water, <br /> with small fruited bulrush, spike rush and/or goft rush <br /> planted around the wetland treatment cell perimeter. <br /> Required density of plantings is a minimum of one per 2.25 <br /> square feet (1. 5� O.C. ) . Plants of the same type should ba <br /> planted in groups, rather than in a completely random <br /> pattern. <br /> Access to the wetpond is required as detailed in section 4- <br /> J k 6. 7 of the City's Desiqn and Construction Standards end <br /> QSpecificationrs. in particular, an access road to the bottom <br /> of the open water cell is required per City etandards. <br /> a,� <br />