Laserfiche WebLink
�;:E�� PL/BL/C I�t/O«X5 <br /> ,. <br /> October 30, 1996 <br /> Mr. Robert Tour <br /> Casino Associates <br /> 50 116th Avenue SE <br /> Bellevue, WA 98004 <br /> Subject: Victorian Place - Easements <br /> City of Everett Water Main <br /> PiJD Power <br /> Dear Mr. Tour: <br /> It is my understanding that your company had requested that utility easements granteJ to the City <br /> for this project not be recorded until the buildings for this project arc completed. <br /> A IS foot ezclusive easement for the water systcm is requited to be granted to the City of Everett <br /> per the Everett Design and Conswctior, Standards for Deveiopments. The contractor installed <br /> water mains and services, but may have made some changes in locadon due to conflicts with other <br /> existing utilities. <br /> The Snohomish County PUD No. 1 was granted an easement to install their electrical system and <br /> procaded to install same. The Public Works Inspactor, Carroll Tollefson, stated that the power <br /> line is three (3) feet or less in horizontal distance from the water main in the area between <br /> buiidings 3 and 4. <br /> The issue is twofold: <br /> 1) The easement to the City is eaclusivc. <br /> 2) Safety of the City's maintenance crew repairing an emergency break of the water system. <br /> The City of Everett is requiring that the separation between the two utilities be 7�h feet. This may <br /> be accomplished by relaying the PUD system in the encroached areas, or roinstalling the water <br /> systems in the encroachad areas. The City of Everott cannot accept the water system nor issue a <br /> Certificate of Occupancy for this pmject undl this issue is resolved. <br /> If you have any quesdons, please call me at (206)259-8977. <br /> Sincerely, <br /> C��%�Z���� <br /> Alan E. Locke <br /> Engincering/Public Services <br /> w�i <br /> CITY OF EVERETT•3200 Cedar Street• Everett, WA 98201 • (206) 259-BB00 • Fax (206) 259•8856 <br />