|
CITY OF EVERETT 2018 TO 2023 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRiO- PE RNV CONST. Est.2018-2023 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME START START START Expenditures AGENCY NO.
<br /> 42 Local Access-SAF 1 BNSF RR safety Improvements Jan.18 Jun.19 $600,000 * EVERETT
<br /> 43 Local Access-SAF 2 Local Roadway Safety Projects Jan.18 Jun.19 $120,000 * EVERETT
<br /> • 44 Local Access-SAF 3 Safe Routes to Schools Jan.18 Apr.19 $600,000 * EVERETT
<br /> 45 Local Access-PR/M 1 Bridge Rehabilitation Program Jan.18 Jul.19 $3,000,000 * EVERETT
<br /> 46 Local Access-PR/M 2 Annual Street Overlay Program Jan.18 Jul.19 $6,000,000 * EVERETT
<br /> 47 Local Access-PR/M 3 Sidewalk repair and replacement Jan.18 May 19 $360,000 * EVERETT
<br /> 48 Local Access-PR/M 4 Pavement Marking Project Jan.18 May 19 $210,000 * EVERETT
<br /> 49 Local Access-STR 1 106th Place SE Improvements Nov.18 Jun.19 $650,000 * EVERETT 34
<br /> 50 Local Access-STR 2 3rd Avenue SE Street Improvements Jan.18 Apr.19 $675,000 * EVERETT 35
<br /> 51 Local Access-STR 3 Local Street Improvements Jul.18 May 19 $580,000 * EVERETT
<br /> 52 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. Aug.18 Jun.19 $300,000 * EVERETT 36
<br /> 53 Local Access-STR 5 Simpson Site Access Improvements Aug.18 Jun.19 $2,000,000 * EVERETT 37
<br /> 54 Local Access-STR 6 Downtown Streetscape Improvements Jul.14 Jan.19 Apr.19 $8,000,000* EVERETT 38
<br /> 55 Local Access-SIG 1 Traffic Signal Central Controller Replacement Jan.18 Jul.19 $600,000 * EVERETT
<br /> 56 Local Access-SIG . 2 Traffic Signal Interconnect Jan.18 May.19 $240,000 * EVERETT
<br /> 57 Local Access-SIG 3 Traffic Signal Improvements Jan.18 Jun.19 $900,000 * EVERETT•
<br /> 58 Local Access-SIG 4 Traffic Sign Improvements Jan.18 Jun.19 $500,000 * EVERETT
<br /> 59 Local Access-NEI 1 Neighborhood Block Grants Jan.18 May.19 $360,000 * EVERETT
<br /> 60 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Jan.18 May.19 $2,400,000 * EVERETT
<br /> 61 Local Access-NEI 3 Residential Sidewalks Jan.18 May.19 $2,400,000 * EVERETT
<br /> 65 Local Access-NM 2 Smith Island Bike/Ped improvements Jan.10 Jan.19 May 18 $1,000,000 * EVERETT 39
<br /> 66 Local Access-NM 3 Bicyle Master Plan Implementation Jan.19 Jan.19 $200,000 * EVERETT
<br /> -..I 67 Local Access-NM 4 Riverside Business Park Ped trail Apr.18 Apr.19 $700,000 * EVERETT 40
<br /> 68 Local Access-NM 5 West/East Marine View Drive Bike-Ped Improvements Aug.18 Apr.19 $500,000 * EVERETT 41
<br /> 69 Local Access-NM 6 47th Street Pedestrian Improvements Jan.18 Jun.19 $500,000 * EVERETT 42
<br /> 70 Local Access-NM 7 Pigeon Creek No.1/BNSF Crossing Jan.19 Jul.20 Jan.22 $925,000 * EVERETT 43
<br /> 63 Local Access-NM 8 Henry Jackson Park Ped Bridge Jan.20 May.21 Jul.23 $2,700,000 * EVERETT 44
<br /> 71 Local Access-NM 9 Grand Ave./N.Marina Ped-Bike Connection Jan.18 Jan.19 May.20 $1,050,000 * EVERETT
<br /> 72 Local Access-NM 10 Shoreline Access Improvements Apr.19 Jan.19 $2,400,000 * EVERETT
<br /> 64 Local Access-NM 1 36th Street/BNSF Rail Line Ped/Bike Crossing Jan.08 Nov.19 Jun.20 $2,800,000 * EVERETT 45
<br /> 73 Local Access-NM 11 Snohomish River Bike and Ped.Bridge Nov.18 Jan.20 $9,000,000 * EVERETT 46
<br /> 74 Local Access-NM 12 Pigeon Creek Road No.1 Improvements Apr.18 Jan.18 $1,000,000 * EVERETT 47
<br /> 75 Local Access-NM 13 Lowell Snohomish River Rd.Bike/Ped Connection May.18 Aug.19 Jan.20 $1,900,000 * EVERETT 48
<br /> 76 Local Access-NM 14 Everett Non-Motorized Projects May.19 Aug.19 Jan.20 $760,000 * EVERETT
<br /> 77 Local Access-NM 19 Riverfront District Bike/Ped Paths Jul.18 Jan.19 $500,000 * EVERETT
<br /> 78 Local Access-NM 19 Interurban Trail Bike/Ped Path Improvements Jul.18 Jan.19 $500,000* EVERETT
<br /> 79 Local Access-NM 18 Bicyle Detection Signals Jan.19 Jan.18 $200,000* EVERETT
<br /> 80 Local Access-NM 15 ADA Signals Jan.19 Jan.18 $200,000* EVERETT
<br /> 81 Local Access-NM 19 ADA Ramps Jan.19 Jan.18 $200,000* EVERETT
<br /> $67,630,000
<br /> NOTE: Projects shown in bold type(if any)were not included in the 2017-2022 Six-year TIP. •
<br /> *A portion or all of the funding for this project has not yet been committed.
<br /> Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement;
<br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement
<br /> Z\,)
<br />
|