Laserfiche WebLink
EXPENSES <br /> Design $1,012,860 <br /> Construction 6,684,660 <br /> Project Costs 562,085 <br /> Transfer Out— to CIP4 76,395 <br /> Total $8,336,000 <br /> Section 3: That the remaining balance of $76,395 be transferred to CIP 4. <br /> CITY OF EVERETT <br /> rI A°101 <br /> V ' � Zeal <br /> Rayphanso', Mayor <br /> Attest: <br /> 1� Yr/ <br /> S aron Fuller, City Clerk <br /> Passed: 11/10/2015 <br /> Valid: 11/17/2015 <br /> Published: 11/23/2015 <br /> Effective: 12/02/2015 <br />