Laserfiche WebLink
r <br /> EXPENSES <br /> Design $1,012,860 <br /> Construction 6,684,660 <br /> Project Costs 562,085 <br /> Transfer Out—to CIP4 76,395 <br /> Total $8,336,000 <br /> Section 3: That the remaining balance of $76,395 be transferred to CIP 4. <br /> CITY OF EVERETT <br /> Ray Stephanson, Mayor <br /> Attest: <br /> Sharon Fuller, City Clerk <br /> Passed: <br /> Valid: <br /> Published: <br /> 23 <br />