Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> • <br /> PROJECT TITLE: <br /> Supplemental Agreement Briefing COUNCIL BILL# <br /> Number 3 to the Local Agency Proposed Action Originating Department Public Works <br /> Standard Consultant Consent Contact Person Ryan Sass <br /> Agreement No. PW 3395 with Action Phone Number (425)257-8942 <br /> TranTech Engineering, LLC, First Reading FOR AGENDA OF November 10, 2015 <br /> for the Broadway Bridge Second Reading <br /> Replacement Project Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President .019 <br /> Location Preceding Action Attachments Department(s)Approval <br /> Broadway Bridge over Agreement No. PW Supplemental Agreement Public Works <br /> BNSF Railroad tracks 3395, 6/12/13 Council Number 3 . <br /> approved Amendment 2 <br /> Amount Budgeted $ 1,969,974 <br /> Expenditure Required $ 1,969,974 Account Number(s): PW3395 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Because of the technical requirements to accomplish the engineering of the Broadway Bridge Replacement <br /> Project,the City utilized the services of a structural engineering consulting firm. TranTech Engineering, <br /> LLC,was selected through a qualification based selection process. <br /> The project is approaching completion but the consultant agreement will likely expire before the post- <br /> construction activities are complete. <br /> This agreement extends the Agreement completion date to December 31, 2016 with no changes to scope of <br /> work and no changes to maximum amount payable. <br /> The funding for this agreement is: <br /> Federal Grant—STPD 2715(009) $1,969,974 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Supplemental Agreement Number 3 to the Local Agency Standard Consultant <br /> Agreement No. PW 3395 with TranTech Engineering, LLC, for the Broadway Bridge Replacement Project <br /> extending the date of completion at no additional cost to the City. <br /> 37 <br />