My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/11/10 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/11/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 9:55:43 AM
Creation date
11/23/2015 11:03:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A—Statement of Work 1 <br /> Scope of Work <br /> Task 1—Vehicle Performance Assessment <br /> CEM will work closely with project partners and the fleet managers to understand and identify <br /> electric bus platforms of interest. CEM will develop dynamic simulation models of the vehicle <br /> powertrain to assess energy consumption and efficiency. The goal of this task is to understand <br /> the vehicle's energy consumption and ability to make the route and provide the services required <br /> by the fleet. <br /> The following subtasks are envisioned for completing Task 1. <br /> Subtask 1.1—Obtain Vehicle(and Charger) Specifications <br /> CEM will work closely with the Everett Transit fleet manager to obtain vehicle <br /> specifications for up to three electric bus models and a fossil fuel counterpart. These <br /> specifications will also include the vehicle charger for the electric buses. The fleet <br /> manager will be responsible for ensuring CEM obtains all data necessary from electric <br /> bus vendors to provide modeling services. This data includes,but is not limited to, <br /> engine/motor torque-speed curves,fuel/energy storage specifications,vehicle drivetrain <br /> ratios and efficiencies, and vehicle physical specifications, such as frontal area,tires, and <br /> weight ratings. If this data cannot be provided by Everett Transit, CEM will use publicly <br /> available information from each bus vendor and develop powertrain models based on <br /> typical specification for similar motors,batteries, or other system components. <br /> Subtask 1.2—Develop Vehicle Route Models <br /> CEM will work closely with the Everett.Transit fleet manager to identify and collect data <br /> on up to three routes deemed typical and suitable for the alternative fuel vehicles under • <br /> consideration. CEM will rely on the fleet manager to arrange a time for CEM to conduct <br /> data collection on a similar vehicle using a GPS data logger. Alternatively,the fleet <br /> manager may provide CEM with speed versus time data from an existing dataset for their <br /> vehicle(s),provided that the data sample rate is 1 Hz or greater. <br /> Subtask 1.3—Construct Vehicle Powertrain Models <br /> CEM will build a detail dynamic model of the proposed electric buses. The models will <br /> use data obtained from Subtask 1.1 and will simulate operation of the vehicles on the <br /> route obtained in Subtask 1.2. <br /> Subtask 1.4—Exercise Vehicle Models <br /> CEM will run the vehicle model and evaluate its efficiency, energy consumption, and <br /> ability to perform on the fleet route. <br /> Task 2—Life Cycle Cost Analysis <br /> CEM will work closely with the Everett Transit fleet managers to assess the life cycle cost of the <br /> electric buses under consideration.' The results generated by CEM in Task 1 will provide the <br /> basis for the life cycle cost analysis in Task 2. The goal of this task is to identify fuel costs and <br /> 12 <br /> 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.