Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA I'I'BM COVER SHEET 6 <br /> PROJECT TITLE: <br /> Amendment No. 2 to Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with HDR Consent Contact Person John Nottingham <br /> Engineering Inc. for the Final • Action Phone Number 425-257-8872 <br /> Effluent North Pump Station First Reading FOR AGENDA OF July 5, 2017 <br /> and Chlorination Building Pre- Second Reading <br /> design Study and extend the Third Reading <br /> contract to March 31,2019 Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Pollution Control Professional Services Amendment No. 2 Public Works, Legal <br /> Facility Agreement approval by <br /> Council on 01/11/16, <br /> Amendment No. 1 <br /> Approved by Council on <br /> 2/2/17 <br /> Amount Budgeted $8,700,000 Fund 339 <br /> Expenditure Required $930,512 WO#3614 <br /> Budget Remaining $7,769,488 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Public Works has a Professional Services Agreement with HDR Engineering Inc. to provide a pre-design <br /> study for the upgrade of the Water Pollution Control Facility Final Effluent North Pump Station and the <br /> replacement of the North Chlorination Building. Amendment No. 2 modifies the agreement to include <br /> design and construction assistance services for the recommended upgrades to the pump station and the <br /> replacement of the existing chlorine building. Additionally, the amendment includes a contract time <br /> extension that is necessary for completion of this work. This amendment will cost the City an additional <br /> $930,512 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 2 to the Professional Services Agreement with HDR <br /> Engineering Inc. for the Final Effluent North Pump Station and Chlorination Building pre-design study and <br /> extend the contract to March 31, 2019 for an additionaa1930,512. <br />