My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 CALIFORNIA ST BASE FILE 2017-10-16
>
Address Records
>
CALIFORNIA ST
>
2320
>
BASE FILE
>
2320 CALIFORNIA ST BASE FILE 2017-10-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 9:38:29 AM
Creation date
9/8/2017 10:33:19 AM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
2320
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJECTOR PUMP STATION SCHEDULE (1) Z E= <br /> 0 � a <br /> SUMP BASIN DIMENSIONS ELECTRICAL(EACH PUMP) CAPACITY(EACH PUMP) Z e $$ <br /> DISCHARGEti <br /> NUMBER OF DAMETER DEPTH TYPE DIAMETER AMPS VOLTAGE/ TOTAL DEVELOPED Q o s <br /> TAG DESCRIPTION DESCRIPTION MANUFACTURER MODEL PUMPS (INSIDE CLEAR) (INSIDE CLEAR) (FLA) HP PHASE FLOW HEAD NOTES 0 .+ <br /> EJECTOR GRINDER PUMP STATION D3672LSG FIBERGLASS m <br /> EPS-1 TASK#i (SERVES ANNEX BASEMENT) LIBERTY (PACKAGE) 2 30' 72' (PRE FAB) 1-1/4' 15 2.0 HP 208Vl1P 25.0 GPM 80 FT (2)(3)(5) z a <br /> V <br /> c <br /> TASK#2 NO SCOPE -- -- -- --- — -- — -- — --- <br /> W <br /> EJECTOR GRINDER PUMP STATION D3672LSG FIBERGLASS <br /> EPS-3E TASK#3 LIBERTY 2 30' 96' 1-1!4' 15 2.0 HP 208V/1 P 25.0 GPM 80 FT (2)(3)(5) Z a E 8 <br /> (SERVES NORTH TOWER-EAST) (PACKAGE) (PREFAB) s k; <br /> EJECTOR PUMP STATION BASIN-EPS(4) FIBERGLASS <br /> EPS-4W TASK#4 LIBERTY 2 30" 72' 2' 6 314 HP 208Vl1 P 25.0 GPM 25 FT (2)(3)(5) _ •9 <br /> (SERVES NORTH TOWER-WEST) PUMPS-EPS <br /> (PREFAB) . "On <br /> EPS-SE TASK#5 PUMPS ELIMINATED FROM SCOPE -- — -- -- — -- — — — -- — -- — <br /> EPS-6W TASK#6 PUMPS ELIMINATED FROM SCOPE — — -- -- — — — -- — — -- —• -- Qt1ER(� <br /> �OC <br /> EJECTOR PUMP STATION BASIN-EPS(4) FIBERGLASS <br /> EPS-7 TASK#7 (SERVES PARKING GARAGE) LIBERTY PUMPS-LE102M2 2 36' 72' (PRE FAB) 2' 8 1 HP 208Vl1P 75.0 GPM 25 FT (2)(3)(5) <br /> NOTES: <br /> 1.WITH ALL OPTIONS AS NEEDED FOR A COMPLETE OPERATING SYSTEM. S'r '.F1 <br /> 2.PROVIDE DUPLEX CONTROL PANEL,FLOAT SWITCH ASSEMBLY,HIGH WATER ALARM,PUMP FAILURE ALARM AND ALL ASSOCIATED COMPONENTS NECESSARY TO MEET DESIGN INTENT AS PRESENTED ON PLANS. SUMP BASIN ELEVATIONS <br /> 3.COORDINATE W/OWNER FOR SPACE USAGE AND PROVIDE APPROPRIATE ACCESS COVER DURABILITY OPTION(MINIMUM SHALL BE STEEL). (MEASURED FROM BOTTOM OF BASIN) <br /> 4.CUSTOM BASIN SYSTEM:CONTRACTOR TO PROVIDE MANUFACTURER WITH SPECIFICATIONS GIVEN IN THIS SCHEDULE FOR CUSTOM PUMP/BASIN PACKAGE. <br /> 5.BASIN DEPTH BASED ON INVERTS PROVIDED BY CONTRACTOR. PUMPS OFF 12 in <br /> LEAD PUMP ON 27 in <br /> LAG PUMP ON 30 in Z <br /> O <br /> HIGH WATER ALARM 33 in <br /> INLET 36 in > <br /> w <br /> FINISHED FLOOR(TOP OF BASIN) 72 in <br /> SEQUENCE OF OPERATIONS-EJECTOR PUMP STATION a <br /> 0 <br /> PUMP DOWN CYCLE: <br /> O <br /> Z <br /> 1. BASIN FILLS TO'LEAD PUMP ON'LEVEL(SEE SUMP BASIN ELEVATIONS). <br /> 2. "LEAD PUMP'FLOAT ACTUATES AND POWERS ON LEAD PUMP. <br /> 3. LEAD PUMP OPERATES UNTIL LEVEL OF WATER IN BASIN REACHES"PUMPS OFF"FLOAT LEVEL. <br /> 4. 'PUMPS OFF'FLOAT ACTUATES AND TURNS LEAD PUMP OFF. w <br /> 5. BASIN FILLS TO'LAG PUMP ON'LEVEL(SEE SUMP BASIN ELEVATIONS). uj <br /> 6. 'LAG PUMP'FLOAT ACTUATES AND POWERS ON LAG PUMP. O N <br /> 7. LAG PUMP OPERATES UNTIL LEVEL OF WATER IN BASIN REACHES'PUMPS OFF"FLOAT LEVEL. � ,^ <br /> 8. CYCLE REPEATS. V I <br /> 00 <br /> a LW J Q (31f <br /> * -- Q I--I <br /> NOTES: Q Q Z <br /> IF WATER LEVEL REACHES"HIGH WATER ALARM','HIGH WATER ALARM'FLOAT SHALL ACTUATE AND SHALL ACTIVATE AUDIBLE F uj LOL <br /> AND VISUAL ALARM(ALARM TO OPERATE CONTINUOUSLY ONCE ACTUATED UNTIL DEACTIVATED MANUALLY BY SERVICE 7o L <br /> TECHNICIAN).PROVISIONS ARE TO BE MADE TO ALLOW OWNER TO CONNECT THIS ALARM SIGNAL TO THEIR BUILDING 2 Q Uj J <br /> AUTOMATION SYSTEM. a <br /> Q UJ <br /> IF ANY PUMP FAILS,AUDIBLE AND VISUAL ALARM SHALL ACTIVATE AND ALTERNATING PUMP FUNCTION SHALL CEASE TO OPERATE w Q Q <br /> (REMAINING FUNCTIONING PUMP SHALL OPERATE EXCLUSIVELY WHEN CALL FOR ANY PUMP(ANY'PUMP OW FLOAT ACTUATES) = O U W <br /> OCCURS.ALARM TO OPERATE CONTINUOUSLY ONCE ACTUATED UNTIL DEACTIVATED MANUALLY BY SERVICE TECHNICIAN). O O w <br /> PROVISIONS ARE TO BE MADE TO ALLOW OWNER TO CONNECT THIS ALARM SIGNAL TO THEIR BUILDING AUTOMATION SYSTEM. <br /> Lr_ N <br /> M <br /> IF ANY PUMP RUNS FOR LONGER THAN THREE MINUTES WITHOUT CYCLING OFF(INFLOW IS GREAT ENOUGH TO REQUIRE THE N <br /> PUMP TO RUN LONGER THAN THREE MINUTES TO PUMP DOWN TO'PUMPS OFF-FLOAT LEVEL),SYSTEM SHALL POWER ON <br /> SECOND PUMP(PUMP NOT ALREADY PUMPING).BOTH PUMPS SHALL OPERATE UNTIL LEVEL OF WATER IN BASIN REACHES <br /> "PUMPS OFF"FLOAT LEVEL.BOTH PUMPS SHALL TURN OFF WHEN LEVEL OF WATER REACHES'PUMPS OFF'FLOAT LEVEL. <br /> ALTERNATING OPERATION AS DESCRIBED ABOVE SHALL RESUME. SHEET TITLE: <br /> PARKING <br /> OIL/SAND SEPARATOR SCHEDULE SCHEDULES <br /> N CONNECTIONS(2) <br /> TAG DESCRIPTION MANUFACTURER MODEL CAPACITY NOTES <br /> INLET OUTLET VENT(TANK) <br /> SOS-7 OIL 8 SAND SEPARATOR <br /> (SERVES PARKING GARAGE) STRIEM OS-75 75 GPM 6'0 610 310 (1)(2x3) <br /> DATE: 1/27/2017 <br /> NOTES: CONSTRUCTION SET <br /> 1.WITH ALL OPTIONS AS NEEDED FOR A COMPLETE OPERATING SYSTEM. <br /> 2.CONNECTIONS ARE NOT STANDARD:CONTRACTOR TO CONFIRM SPECIAL ORDER WITH MANUFACTURER. ONE INCH AT FULL SCALE. <br /> 3.WITH TRAFFIC RATED LID. IF NOT,SCALE ACCORDINGLY <br /> SHEET: <br /> a <br /> P5.72 <br /> 4 <br /> fi SHEET OF <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.