Laserfiche WebLink
Work Activity Work Order Page 1 <br /> 8/25/2017 10:51 <br /> Issued By OBS OLHAVA,BRAD S. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 11/17/2016 <br /> Fund 401 Account 5 Program 710 Function 123 Activity 673 <br /> Program <br /> Title INSTALL 3200 CEDAR ST 710123673 <br /> Work Order No 20162611 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 11/17/2016 Time 13:01 Original WO Billing <br /> Customer Information <br /> Customer Name BRIAN DOOLAN Customer Id <br /> Address Street <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N <br /> Phone No ( ) Ext <br /> Second Phone ( ) Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 3200 Street CEDAR ST <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem <br /> Sub Problem <br /> Requested By DBM1 DOOLAN, BRIAN M. Date Requested <br /> Agency Related Request <br /> Initiated From <br /> Utility Locate (USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept PW PUBLIC WORKS Priority Estimated Hours <br /> Crew SCONST SEWER CONSTRUCTION(OLHAVA) <br /> Contractor <br /> Assigned To SCM1 SUNDBERG,CURT M. <br /> Assigned By OBS OLHAVA, BRAD S. <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY_MATERIAL_IN THE AMOUNT OF$594.97 WAS JOURNALIZED <br /> IN 2016. <br /> Action Taken COMBINED TWO EXISTING CBS TO THE COMBINED SYSTEM WITH 6"PVC. <br /> Recommended Action ROUTE DRAIN LINES TO DCB2995G05 TO SEPERATE FROM MS4 SYSTEM <br /> Approved By SCM1 SUNDBERG, CURT M. Job Cost Information(Y/N) <br /> Start Date / / Time Date Completed 1/4/2017 Permit No <br /> Completed By Time Follow Up? <br />