Laserfiche WebLink
Work Activity Work Order Page 1 <br /> 8/23/2017 9:45 <br /> Issued By OBS OLHAVA, BRAD S. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 6/29/2016 <br /> Fund 401 Account 5 Program 710 Function 123 Activity 673 <br /> Program <br /> Title INSTALL 1003 CHARLES AVE 710123673 <br /> Work Order No 20161735 Project Activity Type SERVICE REQUEST Status CL <br /> Status 6/29/2016 Time 09:58 Original WO Billing <br /> Customer Information <br /> Customer Name HUNTER, DAN Customer Id <br /> Address 1003 Street CHARLES AVE <br /> Apartment No City <br /> State Zip <br /> Subdivision Change Map Y/N Y <br /> Phone No ( 425 ) 923-3229 Ext <br /> Second Phone ( ) Ext <br /> E-Mail Address <br /> Problem Information <br /> Address 1003 Street CHARLES AVE <br /> From Cross Street <br /> To Cross Street <br /> City Zip <br /> Subdivision Map Book Map Reference <br /> Problem DRAIN DRAINAGE <br /> Sub Problem SWM SURFACE WATER MANAGEMENT <br /> Requested By MCL1 MALLAND, CHAD L. Date Requested 12/31/2015 <br /> Agency Related Request 00148911 <br /> Initiated From PUBLIC PUBLIC <br /> Utility Locate (USA) No 16174919 Called Date Expiration Date <br /> Assignment Information <br /> Dept PW PUBLIC WORKS Priority Estimated Hours <br /> Crew SCONST SEWER CONSTRUCTION (OLHAVA) <br /> Contractor <br /> Assigned To SCM1 SUNDBERG, CURT M. <br /> Assigned By OBS OLHAVA, BRAD S. <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments INVENTORY MATERIAL IN THE AMOUNT OF$1082.22 WAS <br /> JOURNALIZED IN 2016. <br /> Action Taken INSTALLED NEW 8"PLASTIC PIPE FROM TYPE II TANK ON FRIDAY AND CHARLES.8" DRAIN <br /> PIPE RUNS UP CHARLES TO A CATCH BASIN AT END OF CHARLES ST. FRENCH DRAIN AND <br /> GUTTER DRAIN WAS INSTALLED FOR GROUND WATER AND SURFACE WATER. <br /> Recommended Action INSTALL CB, FRENCH DRAIN AND TROUGH DRAIN AT LOWER END OF PED PATH THEN PLUMB <br /> DOWN HILL TO DCB3095T09 <br />