Laserfiche WebLink
INSPECTION REPORT <br /> Date Permit: to g <br /> EI 1T <br /> Contractor: <br /> Owner: - <br /> SiteAddreSS 1j� Q��V�✓� - � — <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork [I Footing ❑ Rough In ❑ Rough In <br /> duit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Rough F]Structural Slab ❑OK to insulate El OK to insulate <br /> e e ❑Framing ❑ Rooftop Units ❑Water Service <br /> Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> CONSULTATION: <br /> AL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> -11-07 FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> N <br /> co a- <br /> r Pc.— , <br /> 6 r - a-f <br /> /7 a NG <br /> Inspecto . Date: 91t`1 `b <br /> EIR(4/09) X?/�N/1Tc=RE FORMS t PROMOTIONS•42i/48II-0900 <br />