McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 1. In the event that the Owner elects to waive its remedies for any breach by Contractor or any <br /> covenant, term or condition of this Contract, such waiver by the Owner shall not limit the <br /> Owner's remedies for any succeeding breach of that or of any other term covenant, or <br /> ' condition of this Contract. <br /> 5.5 Possession and Use of Completed Portions of the Work <br /> A. The Owner shall have the right to take possession of and use completed or partially completed <br /> portions of the Work even though the time for completing the Work for such portions may not <br /> have expired. Operations and maintenance costs of use of such Work will be borne by the <br /> Owner. Such possession and use shall not be deemed as acceptance of the Work. If such prior <br /> possession or use increases the cost of the Work, the Contractor may be entitled to request extra <br /> compensation by giving Notice and following the procedures of ARTICLE 10. NOTICE TO <br /> OWNER and ARTICLE 12. CONTRACT CLAIMS within five days of each occurrence. The <br /> Contractor shall not submit a Contract Claim for possession by the Owner of portions of the <br /> Work specifically required in the Contract Documents to be placed into use or operation before <br /> completion of the entirety of the Work. <br /> 5.6 Possession of Incomplete Portions of the Project <br /> A. Should the Contractor fail to meet any date specified for Substantial Completion of Work or any <br /> portion of work requiring early possession and use by the Owner,the Owner may, after a ten-day <br /> notice to the Contractor, take over such portion or any Work that is behind schedule. In such <br /> case,the Owner's Representative will prepare a list of incomplete Work taken over by the Owner. <br /> The cost of Owner's work will be charged to and deducted from amounts due to the Contractor. <br /> The Substantial Completion date of the entire or a portion of the Project will be established as the <br /> date when the Owner actually begins using the Project or portion of the Project for its intended <br /> purpose. Division of responsibilities between Owner and Contractor, beginning of warranties, <br /> and any other issues relating to Substantial Completion shall be as specified in 5.7. Substantial <br /> Completion. <br /> 1 5.7 Substantial Completion <br /> A. When the Contractor considers the Work to be Substantially Complete and ready for its intended <br /> use, it shall give Notice to the Owner's Representative. The Notice shall include an itemized list <br /> of remaining incomplete Work. If the Owner's Representative determine the Work is not <br /> substantially complete,the Contractor will be notified in writing, identifying the reasons for such <br /> a determination. <br /> ' 1. If the Owner's Representatives find the Work substantially complete, he or she will meet <br /> with the Contractor to: <br /> a. Prepare a Punch List of incomplete items of Work. <br /> b. Define the division of responsibility between Owner and Contractor with respect to <br /> security. operation,maintenance, heat,utilities, insurance, and warranties. <br /> c. Describe any other issues related to acceptance of the substantially completed Work. <br /> ' B. If the Owner's Representative is not an employee of the Owner, the Owner's Representative will <br /> write to the Owner upon reaching agreement with the Contractor, certifying that the Work is <br /> substantially complete, listing the items of incomplete Work, stating the date for completion of <br /> incomplete Work, defining the division of responsibilities, and setting forth any other terms <br /> related to acceptance. In such event, the Owner will review the Owner's Representative's <br /> certification that the Work is substantially complete. if the Owner concurs,the Owner will notify <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -27 <br /> I <br />