My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' time the referenced material or Equipment is delivered to the job Site. The data shall be as <br /> specified and shall include, unless otherwise specified, such items as shop drawings, erection <br /> drawings, reinforcing steel schedules, testing and adjusting instructions, operations manuals, <br /> ' maintenance procedures, parts lists, and record drawings. Such data shall be provided as part of <br /> the Work under this Contract and its acceptability determined by the Owner in its sole discretion. <br /> 8.3 Quality <br /> A. Where detailed Specifications of materials, Equipment, or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work, from firms of established <br /> good reputations, and shall follow standard practices to perform construction Work of good <br /> quality in a workmanlike way. Work performed shall be in conformity and harmony with the <br /> intent to secure the standard of construction and Equipment of Work as a whole and in part. All <br /> Work must comply and conform to applicable building codes in effect when the Work is <br /> performed. <br /> ' 8.4 Material and Equipment Specified by Name <br /> A. When material or Equipment is specified by reference to patents, brand names, or catalog <br /> numbers,the Owner will not usually consider or approve a substitution. However,the Contractor <br /> may offer substitutions of products it considers to be equal to that specified,but the Owner is not <br /> obliged or required to consider or accept such offered substitution. <br /> 8.5 Requests for Substitution <br /> A. The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's <br /> ' offers of substitution shall be made in writing to the Owner's Representative and shall include <br /> sufficient data to enable the Owner's Representative to assess the acceptability of the material or <br /> Equipment for the particular application and requirements. The Owner and Owner's <br /> Representative are not required or obligated to consider or review a request for substitution and <br /> may, in their sole discretion and option,consider or review such requests. <br /> B. If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> ' changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve <br /> the Contractor from responsibility for the efficiency, quality, and performance of the substitute <br /> ' material or Equipment, in the same manner and degree as the material and Equipment originally <br /> specified. Any cost differential associated with a substitution shall be reflected in the offer. If <br /> the Owner approves the substitution, the Contract Documents shall be modified by a Change <br /> Order modifying the Contract Sum in the amount of the cost differential. <br /> 8.6 Demonstration of Compliance with Contract Requirements <br /> A. Inspection <br /> 1. The burden of proving the constructed Work complies with the Contract Documents shall be <br /> on the Contractor at all times. To demonstrate its compliance with the Contract <br /> ' requirements, the Contractor shall assist the Owner's Representative in his or her inspection <br /> and observation of the Work. The Contractor shall grant the Owner's Representative access <br /> to the Work and Work Site,and to places where Work is being prepared, or where materials, <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.