My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> Contractor under the Contract. The Owner may recover such charges from the Contractor or <br /> from its surety. <br /> ' B. Contractor agrees to pay the costs of overtime or excessive inspection and observation costs <br /> incurred by the Owner. Overtime inspection shall include inspection required during Saturdays, <br /> Sundays, City holidays and weekdays, in excess of 40 hours per week or outside of normal <br /> working hours and inspections or observations that result in an inspector or observer working <br /> ' more than forty hours in a week. Costs of such overtime or excessive inspection or observation <br /> include architecture, engineering, construction management services, inspection, general <br /> supervision and Overhead expenses which are directly chargeable to the overtime or excessive <br /> work. Contractor agrees that Owner will deduct such charges from payments due the Contractor. <br /> In the event the Owner by Change Order requires the Contractor to work in excess of the <br /> established schedule of working hours, the Owner will not charge the Contractor for inspection <br /> costs associated therewith. <br /> 9.4 Compensation to Owner for Time Extension <br /> A. The Owner shall be compensated by the Contractor for the actual costs to the Owner of <br /> ' engineering, inspection, general supervision, right-of-way costs, permit fees, Overhead expenses, <br /> and any other ascertainable direct costs to the Owner that are directly chargeable to the Work and <br /> which accrue during the period of such extension. The actual costs do not include charges for <br /> ' final inspection and preparation of the final payment by the Owner. <br /> 9.5 Adjustment of Contract Sum <br /> A. Calculation <br /> 1. Except as otherwise expressly provided in these General Conditions,any and all adjustments <br /> of Contract Sum shall be determined as follows: <br /> ' a. If the parties are able to agree,the price will be determined by using: <br /> 1) Unit prices, if the Work items are defined by unit prices;and <br /> 2) Other prices agreed upon by the Contractor and Owner for Work not defined by <br /> ' unit prices. <br /> b. If the parties cannot agree, the Owner's Representative will determine the price <br /> pursuant to the following order: <br /> 1) Unit prices,if the Work items are defined by unit prices;and <br /> ' 2) Other means to establish the reasonable cost of the Work if it is not defined by <br /> unit prices, including, but not limited to, Force Account as described in 9.7. <br /> Force Account,the Schedule of Values, or estimating manuals. <br /> ' B. Limitations <br /> 1. The following limitations shall apply in determining the amount of an adjustment: <br /> a. Except as otherwise expressly provided, Contractor will only be paid for costs it clearly <br /> ' and convincingly proves it actually and directly incurred, and shall not include <br /> consequential or indirect damages not otherwise expressly permitted by the Contract <br /> Documents. Costs and damages for which Owner shall not be liable under any <br /> circumstances include, but are not limited to: (a)borrowing or interest costs,charges, or <br /> expenses of Contractor; (b) alleged lost profit or Overhead on any other project; and(c) <br /> Contractor's failure or inability to obtain other work. <br /> b. No Contract Claim for adjustment of Contract Sum or additional compensation for <br /> extra, affected, impacted or inefficient Work will be allowed where the Contractor does <br /> not keep and maintain contemporaneous, complete and accurate time records for labor <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.