My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' C. The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is <br /> authorized. <br /> 1. The rates as set forth in the Rental Rate Blue Book (as modified by the current <br /> AGC/WSDOT Equipment Rental Agreement) are the maximum rates allowable for <br /> equipment of modern design and in good working condition. <br /> a. These rates shall be full compensation for all fuel, oil, lubrication,repairs,maintenance, <br /> and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> ' D. The Owner will add 21 percent to equipment costs to cover Project Overhead, general company <br /> Overhead(excluding equipment Overhead included in the Rental Rate Blue Book),and profit. <br /> E. Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental <br /> ' Agreement will be maintained at each region office of the Washington State Department of <br /> Transportation and at each of the offices of the Associated General Contractors of America, in <br /> Seattle, Spokane, Tacoma, Washington and Wilsonville, Oregon, where they are available for <br /> inspection. <br /> 9.11 For Services. <br /> ' A. Compensation under Force Account for specialized services shall be made on the basis of an <br /> invoice from the providing entity. <br /> 1. A "specialized service" shall be one that is typically billed through invoice in standard <br /> ' industry practice. <br /> 2. Before Work is started, the Owner's Representative may require the Contractor to obtain <br /> multiple quotations for the service to be utilized and select the provider with prices and <br /> ' terms most advantageous to the Owner. <br /> 3. In the event that prior quotations are not obtained and the service invoice is submitted by <br /> the Subcontractor, then after-the-fact quotations may be obtained by the Owner's <br /> i Representative from the open market in the vicinity and the lowest such quotation may be <br /> used in place of the submitted invoice. <br /> B. Except as noted below,the Owner will pay the Contractor an additional 21 percent of the sum of <br /> the costs included on invoices for specialized services to cover project Overhead, general <br /> company Overhead, profit, bonding, insurance, Business & Occupation tax, and other costs <br /> incurred. <br /> t C. When a Supplier of services is compensated through invoice, but acts in the manner of <br /> Subcontractor, as described in 9.13 For Contractor Markup of Subcontractors Work of this <br /> provision, then markup for that invoice shall be according to 9.13 For Contractor Markup of <br /> Subcontractors Work. <br /> 9.12 For Mobilization. <br /> ' A. Force Account mobilization is defined as the preparatory work performed by the Contractor <br /> including procurement, loading and transportation of tools and equipment, and personal travel <br /> time, when such travel time is a contractual obligation of the Contractor or a customary payment <br /> ' for the Contractor to all employees. <br /> 1. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -47 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.