My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 2. The nature and circumstances giving rise to the Notice; <br /> 3. The Contract provisions relating to,but not limited to,the event, incident, and direction; <br /> ' 4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that estimate <br /> was determined; and <br /> 5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br /> ' asserting a schedule change or disruption. <br /> B. Contractor Records. <br /> II. Throughout any work related to a Notice, the Contractor shall keep complete and accurate <br /> records of costs, expenses, and time incurred for which Contractor will or may seek an <br /> adjustment. <br /> 2. Contractor waives and is stopped from seeking an adjustment of Contract Sum or Contract <br /> Time where Contractor fails to keep and maintain cost,timekeeping, and scheduling records <br /> segregated and contemporaneously allocated to the subject work for which an adjustment is <br /> sought. <br /> ' a. For example, failure to keep contemporaneous labor and equipment time records <br /> specifically and only allocated to each item of claimed Extra Work shall constitute a <br /> waiver of any Contract Claim for reimbursement or additional Contract Time for each <br /> ' such item of Extra Work. <br /> b. The Contractor shall permit the Owner access to these and any other records needed for <br /> evaluating requests for additional Contract Time or Contract Sum. <br /> ' ARTICLE 11 DIFFERING SITE CONDITIONS <br /> 11.1 General <br /> ' A. Notification <br /> 1. Upon discovery and before such conditions are disturbed, the Contractor shall promptly <br /> provide Notice to the Owner's Representative of: <br /> ' a. Preexisting subsurface or latent physical conditions at the Site differing materially from <br /> those indicated in this Contract, or <br /> b. Preexisting unknown physical conditions at the Site, of an unusual nature, differing <br /> materially from those ordinarily encountered and generally recognized as inhering in <br /> Work of the character provided for in this Contract. <br /> B. Investigation of the Conditions <br /> 1. The Owner's Representative will promptly investigate the conditions. <br /> 2. If the Owner's Representative finds that conditions are materially different and cause a <br /> ' material increase or decrease in the Contractor's cost of performance of the Work,or extends <br /> the duration of the critical path of the schedule, the Owner's Representative will make an <br /> adjustment of Contract Sum or Contract Time. <br /> 3. Extensions of Contract Time will be evaluated in accordance with 5.2.C. Extensions of <br /> Contract Time. <br /> C. Inability to Agree on Adjustment of Contract Sum or Contract Time <br /> 1 <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO# UP3611 00 72 13 -51 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.