My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 1 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 4) Job Overhead. I <br /> 5) Overhead(general and administrative). <br /> 6) Subcontractor's contract claims (in the same level of detail as specified herein is <br /> required for all Subcontractor's contract claims); and <br /> 7) Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the <br /> following language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract <br /> Time, if any,made herein for Work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought, and <br /> is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> 12.3 False Or Omitted Information I <br /> A. General <br /> 1. The Contractor waives each Contract Claim for which it presents material information that it <br /> knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose <br /> material information relating to such Contract Claim. In such case, Contractor shall reimburse <br /> the Owner for any and all fees and expenses incurred in investigating any such Contract CIaim. <br /> 12.4 Remedies <br /> A. General <br /> 1. If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall be <br /> those provided in this subsection. <br /> a. Contractor must timely and strictly comply with the requirements of ARTICLE 10. <br /> NOTICE TO OWNER, ARTICLE 12. CONTRACT CLAIMS and all other <br /> General Conditions relating to the Contract Claim. <br /> b. Adjustments to Contract Time shall be determined pursuant to 5.2.C. Extensions of <br /> Contract Time. <br /> 111 <br /> 2. Failure to comply strictly and timely shall be deemed a waiver of the Contract Claim. <br /> B. Extra Work <br /> 1. Adjustment of Contract Sum <br /> a. If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, <br /> the adjustment shall be calculated and paid as provided in 9.5. Adjustment Of <br /> Contract Sum. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.