My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' the Project and for a period of not less than six years after the date of Final Acceptance of <br /> the Contract. <br /> a. The Contractor shall retain these records for that period. <br /> ' b. The Contractor shall also guarantee that Project records of Subcontractors, Suppliers, <br /> and lower tier Subcontractors, including, but not limited to, the wage, payroll, and cost <br /> records, shall be retained and open to similar inspection or audit for the same period of <br /> time. <br /> B. Audit Performance <br /> 1. The audit may be performed by employees or representatives of the Owner or by an auditor <br /> ' chosen by the Owner. <br /> 2. The Contractor, Subcontractors, or lower tier Subcontractors shall provide adequate <br /> facilities,reasonably acceptable to auditor, for the audit during normal business hours. <br /> ' 3. The Contractor, Subcontractors, or lower tier Subcontractors shall make a good faith effort <br /> to cooperate with the auditors. <br /> ' 4. If an audit is to be commenced more than 60 days after the Final Acceptance date of the <br /> Contract,the Contractor will be given 20 days' notice of the time when the audit is to begin. <br /> 5. If any litigation, claim, or audit arising out of, in connection with, or related to this Contract <br /> ' is initiated,the Project records shall be retained until the later of(a) completion of litigation, <br /> claim,or audit or(b) six years after the date of Final Acceptance. <br /> 17.2 CIaims <br /> ' A. All Contract Claims filed against the Owner shall be subject to audit at any time following the <br /> filing of the Contract Claim. <br /> B. Failure of the Contractor, Subcontractors, or lower tier Subcontractors to maintain and retain <br /> sufficient records to allow the auditors to verify all or a portion of the Contract Claim or to permit <br /> the auditor access to the books and records of the Contractor, Subcontractors, or lower tier <br /> Subcontractors shall constitute a waiver of a Contract Claim and shall bar any recovery <br /> ' thereunder. <br /> 17.3 Required Documentation for Audits <br /> A. As a minimum,the auditors shall have available to them the following documents: <br /> 1. Daily time sheets and supervisor's daily reports. <br /> 2. Collective Bargaining Agreements. <br /> 3. Insurance,welfare,and benefit records. <br /> 4. Payroll registers. <br /> 5. Earnings records. <br /> 6. Payroll tax forms. <br /> ' 7. Material invoices and requisitions. <br /> 8. Material cost distribution worksheet. <br /> 9. Equipment records(list of company equipment,rates, etc.) <br /> 10. Vendors',rental agencies', Subcontractors' and lower tier Subcontractors' invoices. <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.