My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 01 33 00 <br /> SPECIAL PROVISIONS SUBMITTAL PROCEDURES <br /> 1.10 TEST REPORTS <br /> ' A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or <br /> for Owner. <br /> B. Submit test reports for information for assessing conformance with information given and <br /> design concept expressed in Contract Documents. <br /> 1.11 CERTIFICATES <br /> A. Informational Submittal: Submit certification by manufacturer, installation application <br /> ' Subcontractor,or Contractor to Engineer, in quantities specified for Product Data. <br /> B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting <br /> reference data, affidavits,and certifications as appropriate. <br /> C. Certificates may be recent or previous test results on material or product but must be acceptable <br /> to Engineer. <br /> I <br /> 1.12 MANUFACTURER'S INSTRUCTIONS <br /> ' A. Informational Submittal: Submit manufacturer's installation instructions for Engineer's <br /> knowledge as Contract administrator or for Owner. <br /> ' B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and <br /> finishing,to Engineer in quantities specified for Product Data. <br /> ' C. Indicate special procedures, perimeter conditions requiring special attention, and special <br /> environmental criteria required for application or installation. <br /> 1.13 MANUFACTURER'S FIELD REPORTS <br /> A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or <br /> ' for Owner. <br /> B. Submit report in duplicate within two days of observation to Engineer for information. <br /> C. Submit reports for information for assessing conformance with information given and design <br /> concept expressed in Contract Documents. <br /> 1.14 CONSTRUCTION PHOTOGRAPHS <br /> A. Provide photographs of construction throughout progress of Work produced by an experienced <br /> ' photographer acceptable to Engineer. <br /> B. Twice monthly submit photographs to Engineer. <br /> THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 01 33 00- 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.