Laserfiche WebLink
s <br /> 11P- <br /> PUBLIC WORKS' <br /> J <br /> ili <br /> ADDENDUM NO. 1 <br /> TO <br /> THREE LAKES VALVE BYPASS <br /> W.O. # UP-3611 <br /> JULY 31, 2017 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page 3 of <br /> Document 00 41 13 — Bid Form (Stipulated Sum). Failure to comply with this requirement may <br /> render the Bid non-responsive and may cause its rejection. <br /> This Addendum consists of 3 pages, including all revisions, attachments and details. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 1 - DOCUMENT 00 21 13 - INSTRUL I IONS TO BIDDERS <br /> Supplement 1.20.A.3 by adding the following: <br /> 3.f. Within the three-year period immediately preceding the date of the bid solicitation, <br /> not have been determined by a final and binding citation and notice of assessment <br /> issued by the department of labor and industries or through a civil judgment entered <br /> by a court of limited or general jurisdiction to have willfully violated, as defined in <br /> RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW. <br /> Item 2 - DOCUMENT 00 21 13 - INSTRUCTIONS TO BIDDERS <br /> Supplement 1.32 Bidders Checklist by inserting the following new paragraph C: <br /> 3.C. Prior to award, the lowest responsive and responsible bidder must sign and submit <br /> the "Certification of Compliance with Wage Payment Statutes" included in with this <br /> addendum. This certification is NOT required to be submitted with the bid <br /> proposal and may be submitted after bid opening. <br /> Item 3 - DOCUMENT 00 21 13 - INSTRUCTIONS TO BIDDERS <br /> Revise 3.0 to read as follows: <br /> 3.D. The following forms are to be executed after the award of the Contract: <br /> Item 4 - DOCUMENT 00 22 13 — SUPPLEMENTAL INSTRUCT I IONS TO BIDDERS <br /> Revise 1.2.A.1.a to read as follows: <br /> a. The Bidder, or Bidder's subcontractor, must have successfully completed at least two <br /> Similar Projects with the ten years prior to bid opening. <br /> Addendum 1 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />