Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 00 41 13 <br /> SPECIAL PROVISIONS BID FORM- STIPULATED SUM <br /> (SINGLE-PRIME CONTRACT) <br /> ITEM NO. DESCRIPTION UNIT CONTRACT PRICE <br /> 1. BASE BID LS $ ! //44 • c J i <br /> 2. Washington State Sales Tax @ 7.7% <br /> 3. TOTAL BID $ <br /> <F l 4 471 <br /> . <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. ' <br /> B. If this Bid is accepted by the Owner within the time period stated above,we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within 14 calendar <br /> days of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> 3. Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work or we fail to <br /> provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, limited in amount to the lesser of the face value of the Bid security or the <br /> difference between this Bid and the Bid upon which Contract is signed. <br /> D. In the event our Bid is not accepted within the time stated above,the required Bid security will <br /> be returned to the undersigned,according to the provisions of the Instructions to Bidders, unless <br /> a mutually satisfactory arrangement is made for its retention and validity for an extended period <br /> of time. <br /> 1.4 CONTRACT TIME <br /> A. If this Bid is accepted,we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed and to reach <br /> Substantial Completion within the dates required under the Contract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract (Document 00 60 <br /> 13)in the event the project is not completed on or before required time periods. <br /> 3. Contract with the Owner using the Contract form provided herewith, on the terms and <br /> conditions contained herein, to do everything necessary for to complete the construction <br /> of the project within the allotted time. <br /> 11 <br /> THREE LAKES VALVE BYPASS July 19,2017 ' <br /> WO#UP3611 00 41 13 -2 <br />