Laserfiche WebLink
I <br /> I CITY OF EVERETT PUBLIC WORKS00 45 13 <br /> SPECIAL PROVISIONS BIDDER QUALIFICATION STATEMENT <br /> IDOCUMENT 00 45 13—BIDDER QUALIFICATION STATEMENT <br /> 1.1 GENERAL <br /> IA. Fill out the following information: <br /> PROJECT NAME: Three Lakes Valve Bypass(WO#-UP3611) <br /> IDATE: 8/8/17 <br /> I CONTRACTOR'S COMPANY NAME: McClure and Sons, Inc. <br /> ADDRESS: 15714 Country Club Drive <br /> IMill Creek, WA 98012 <br /> TELEPHONE: 425-316-6999 <br /> I EMAIL: bids@mcclureandsons.com or <br /> les@mcclureandsons.com <br /> B. The Bidder must document that the Bidder meets the Supplemental Responsibility Criteria in <br /> I the Supplementary Instructions to Bidders (Document 00 22 13). The Bidder should provide <br /> additional sheets to fully describe referenced projects and experience. <br /> 1. The Supplementary Instructions to Bidders (Document 00 22 13)states that the <br /> Bidder, or Bidder's subcontractor, must have successfully completed at least two <br /> I <br /> Similar Projects within ten years prior to bid opening. List the Similar Project's that <br /> show Bidder, or Bidder's subcontractor has this experience. If listing subcontractor <br /> experience, note subcontractor's name. <br /> PROJECT NAME YEAR OWNER LOCATION DIA/QUANTITY <br /> IMSI/DDJ I) Sumner Central Well Development, 2016 City of Sumner, WA 52"/700LF <br /> I MSI 2) Chambers WWTP BP#319, 2017 Pierce County, University Place WA <br /> 260LF of 30"to 54"welded buried pipe <br /> 3) and various other sizes of welded steel pipe throughout the plant <br /> I <br /> DDJ 4) Transmission Line#5, 2012, City of Everett, WA 51"/600LF <br /> DDJ 5) Transmission Line#5 at Pilchuck River, 2015, City of Everett, WA 51"/500LF <br /> I <br /> 2. Furnish references for information concerning all work Iisted above. <br /> NAME TITLE PHONE EMAIL <br /> IMSI/DDJ 1) Dan Mahlum, RH2 Engineering, P.E 425-951-5340 dmahlumrh2.com <br /> I <br /> MSI 2) Chris Stangl, Mortenson, Mechanical Project Engineer 425-497-7190 <br /> 3) Chris.Stangl@mortenson.com <br /> IDDJ 4) Imco (Prime) Kelly Brown Protect Manager 360-671-3936 kbrownAimcoconstruction.com <br /> DDJ 5) Frank Coluccio (Prime) Bill Austell Project Manager 206-722-5306 bill@coluccio.com <br /> I Mark Sadler, City of Everett, Project Manager msadler�everett a.gov <br /> THREE LAKES VALVE BYPASS July 19,217 <br /> WO#UP3611 00 45 13 - 1 <br /> PIlvided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />