Laserfiche WebLink
I <br /> I <br /> CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> SPECIAL PROVISIONS CONTRACT <br /> IDOCUMENT 00 60 13—CONTRACT <br /> I <br /> 1.1 GENERAL <br /> 4...v‘ _ <br /> A. THIS CONTRACT is made and entered into thisa3 day of AOGOSI , 2017, by and <br /> ' between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington, hereinafter called the "City," and <br /> C(\cClvi� AtJO So S SNL , a <br /> U.I NS I-1 i ts(�'(o� (o WQ <i i p hereinafter called the"Contractor." <br /> IB. In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor,tools,materials, equipment, and supplies required to build and construct and <br /> Ito build and construct in a workmanlike manner the Work, improvements,and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "Three Lakes Valve Bypass <br /> (UP3611)", (the"Project"). <br /> I1.2 DEFINITIONS <br /> IA. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> Notice to BiddersI1. <br /> 2. Instructions to Bidders <br /> 3. General Conditions <br /> 4. Supplementary Conditions(if any) <br /> I 5. Drawings, Standard Plans, and Specifications <br /> 6. Addenda(if any) <br /> 7. Payment and Performance Bond <br /> I <br /> 8. Contractor's Bid Foiin <br /> 9. Other documents described as Contract Documents in Section 00 72 13, General <br /> Conditions <br /> 10. All provisions required by law whether set forth and reproduced herein or not. <br /> 1 B. Terms that are capitalized in a Contract Document but not defined in that Contract Document <br /> shall have the meaning defined to them in the other Contract Documents. <br /> I <br /> C. Contract Time. <br /> Milestone 1: <br /> Ii. <br /> a. Tie-ins completed in number of hours stated in paragraph 1.5.C.1 of Section <br /> 01 10 00—Summary. <br /> 1 <br /> 2. Substantial Completion of the Work shall be achieved within 180 calendar days after the <br /> effective date of the Notice to Proceed for construction. <br /> 3. Physical Completion shall be within 21 calendar days after the actual date of issuance of <br /> Isubstantial completion. <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 60 13 - 1 <br />