Laserfiche WebLink
I <br /> CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> SPECIAL PROVISIONS CONTRACT <br /> or not reduced to judgment or arbitration award, in connection with, or arising out of,this <br /> Contract,or resulting from Contractor's (or its subcontractor's or supplier's)performance <br /> of, or failure to perform,its express and implied obligations under the Contract. <br /> 2. Contractor shall pay any judgment that may be obtained against the City, its officers, <br /> employees, agents or third persons in such suit. The Contractor's obligations under this <br /> Section 8 shall not apply to loss, claims, demands, suits, damage, or liability caused by <br /> the sole negligence of the City. <br /> 3. Application of RCW 4.24.115. 1 <br /> a. If applies to a particular loss, claim, demand,suit, damage, or liability, and <br /> b. such loss, claim, demand, suit, damage, or liability is caused by or results from the <br /> concurrent negligence of (a)the Contractor, its employees, <br /> subcontractors/subconsultants or agents and (b) the City or its agents or <br /> employees, then the Contractor's obligations under this Section 8 shall apply only <br /> to the extent allowed by RCW 4.24.115. <br /> c. The City shall give Contractor reasonable notice of such claim. <br /> d. The City retains the right to approve claims investigation and counsel assigned to <br /> said claim and all investigation and legal work regarding said claim shall be <br /> performed under a fiduciary relationship to the City. <br /> K. Insurance. <br /> 1. The Contractor shall purchase and maintain such insurance as will protect it from any and <br /> all claims, suits, demands, damages, or liability arising out of, or in connection with,this <br /> Contract, or resulting from Contractor's(or its subcontractor's or supplier's)performance <br /> of, or failure to perform, its express and implied obligations under the Contract, <br /> including, but not limited to such claims as may arise out of or result from the <br /> Contractor's operations under the Contract, whether such operations be by itself, any <br /> subcontractor or supplier, by anyone directly or indirectly employed by any of them, or111 <br /> by anyone for whose acts any of them may be liable. <br /> 2. If not specified elsewhere in the Contract, such insurance shall provide coverage at no <br /> less than$2,000,000. <br /> 3. The Contractor's policies shall endorse the City, including its officers,employees, agents <br /> and representatives, as additional insureds. <br /> 4. The Contractor shall comply with the insurance requirements set forth in the Contract • <br /> Documents. <br /> 5. Failure to maintain such insurance shall be a material breach of the Contract. <br /> 6. City shall be entitled to damages for such a breach that include,but are not limited to,any <br /> loss (including, but not limited to, third party litigation expenses and professional fees) <br /> suffered by the City if the City is determined to be solely or concurrently negligent, and if <br /> the City suffers any loss or must pay or defend against any such claim, suit, demand or <br /> damage as a result of such breach. <br /> 111 <br /> L. Waiver of Industrial Insurance Immunity. <br /> 1. Contractor waives any right of contribution againstthe City. <br /> 2. It is agreed and mutually negotiated that in any and all claims against the City, its agents <br /> or employees, the Contractor, a subcontractor, anyone directly or indirectly employed by <br /> the Contractor or subcontractor, or anyone for whose acts any of them may be liable, the <br /> defense and indemnification obligations hereunder shall not be limited in any way by any111 <br /> limitation on the amount of damages, compensation, or benefits payable by or for the <br /> THREE LAKES VALVE BYPASS July 19, 2017 1 <br /> WO#UP3611 00 60 13 -4 <br />