My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> ' 53. Subcontractor: An individual or entity having a direct contract with Contractor or with any <br /> other Subcontractor for the performance of a part of the Work. <br /> 54. Submittals: The information required by the Contract Documents provided by Contractor <br /> to the Owner's Representative or Owner. <br /> 55. Substantial Completion: The day on which the Owner or Owner's Representative <br /> determines the Owner has full and unrestricted use and benefit of the Project, from both the <br /> operational and safety standpoints and only minor incidental Work, replacement of <br /> temporary substitute facilities, or minor correction or repair Work remains. Determination <br /> of Substantial Completion in whole or in part is solely at the discretion of the Owner. <br /> ' Substantial Completion does not mean complete in accordance with the Contract nor shall <br /> Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> ' 56. Supplier: A manufacturer, fabricator, supplier, distributor,materialman, or vendor having a <br /> direct contract with Contractor or with any Subcontractor to furnish materials or Equipment <br /> to be incorporated in the Work. <br /> ' 57. Total Float: The amount of time any given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> 58. Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> ' wheelchairs,and equestrian traffic. <br /> 59. Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor billings, <br /> ' or both, due to any reason whatsoever,including a Project extension. <br /> 60. Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> ' 61. Work: Refers to the Project and the labor, materials, Equipment, supplies, services, and <br /> other items necessary for the execution, completion and fulfillment of the Contract. <br /> ' 1.2 Contract Documents <br /> A. The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> ' 2. Supplemental agreements between Owner and Contractor, if any, subsequent to the Owner's <br /> execution of the Contract; <br /> ' 3. Addenda; <br /> 4. The Contract; <br /> 5. Specifications, including, but not limited to, these General Conditions and other numbered <br /> Sections; <br /> 6. Supplementary Conditions, if any; <br /> ' 7. Drawings; <br /> 8. Change Orders; <br /> 9. City of Everett standard plans in effect as of the date Bids are opened; <br /> ' 10. Instructions to Bidders; <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.