McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ' CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> CONDITIONS. Interference with the Work is defined as a utility that crosses or <br /> projects into the plane of the Work at an elevation between the top and bottom of the <br /> Work. If it is necessary to remove, relocate, or temporarily maintain the utility, that <br /> work shall be included in a Change Order. The utility owner has the option of doing <br /> such work or permitting the work to be performed by the Contractor. In either case, the <br /> cost of the work incurred by or charged to the Contractor will be included in a Change <br /> I <br /> Order. <br /> 2.4 Submittals <br /> ' A. Where required by the Contract Documents, the Contractor shall submit information which will <br /> enable the Owner's Representative to advise the Owner whether the Contractor's proposed <br /> materials,Equipment or methods of work are in general conformance to the design concept and in <br /> compliance with the Drawings and Specifications, such as catalog cuts and shop, working or <br /> ' detail drawings. In its Submittals, the Contractor shall expressly and explicitly notify the <br /> Owner's Representative of any and all deviations from the Specifications. Without express and <br /> explicit Notice of a deviation from the Contract requirements, approval of a Submittal does not <br /> relieve Contractor from complying with Contract requirements. The Owner's approval of a <br /> Submittal did not constitute a waiver of the Contract requirements. The Owner or Owner's <br /> Representative shall respond to a Submittal within 30 days of receipt. The Owner or Owner's <br /> Representative may extend this time for good cause by notifying the Contractor. The Owner will <br /> not be obligated to accept or pay for Work performed by the Contractor that may be affected by <br /> materials, Equipment, or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The Owner shall not be responsible <br /> ' for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review, comment, and <br /> correction. Contractor's failure to submit required information in sufficient time for review, <br /> ' comment and correction shall be deemed a waiver of any and all Contract Claims for adjustment <br /> of Contract Sum or Contract Time arising out of, or related to, such a Submittal. Contractor <br /> acknowledges and agrees that it may not rely upon receiving the Owner's response to a Submittal <br /> in less than 30 days, unless the Owner explicitly changes this section by a signed Change Order. <br /> Requests for information or clarification from the Contractor to the Owner shall be treated as a <br /> Submittal. <br /> ' 2.5 Contractor's Copies of Contract Documents <br /> A. The Contractor shall keep at the construction site at least one set of Contract Documents and one <br /> set of full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> ! ARTICLE 3 OWNER <br /> 3.1 General <br /> A. The Owner, and the Owner's Representative, shall have the authority to act as the sole judge of <br /> the Work, Equipment and materials with respect to both quantity and quality as set forth in the <br /> Contract. It is expressly stipulated that the Drawings, Specifications and other Contract <br /> ' Documents set forth the requirements as to the nature of the completed Work and do not purport <br /> to control the method of performing Work except in those instances where the nature of the <br /> completed Work is dependent on the method of performance. <br /> ' B. The Owner has the authority to act, do, perform, and make any all decisions and actions <br /> authorized by the Contract Documents, including, but not limited to, Change Orders, progress <br /> ' THREE LAKES VALVE BYPASS July 19, 2017 <br /> WO#UP3611 00 72 13 - 13 <br /> I <br />