My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 1 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> a. Contractor shall submit, update and maintain schedules as required by the Contract I <br /> Documents. <br /> b. The Contractor shall provide sufficient material, equipment, and labor to meet the <br /> interim milestones, Substantial Completion, Physical Completion and Completion <br /> Dates provided by the Contract Documents. The Owner allocates its resources to a <br /> Contract based on the total time allowed in the Contract. The Contractor may submit a <br /> schedule indicating Completion Date earlier than the end of Contract Time, but Owner <br /> cannot guarantee its resources will be available to meet such schedule. Owner shall not <br /> pay or be liable for any additional compensation if the Contractor is not able to meet a <br /> schedule that indicates a Completion Date earlier than the end of Contract Time. <br /> c. Failure to schedule Owner furnished or installed materials and Equipment for <br /> installation on or after its planned arrival pursuant to the Owner's contract with the <br /> supplier or failure to Notify the Owner of tasks dependent upon the fact or date of <br /> arrival of such Owner furnished materials and Equipment, constitute a waiver by <br /> Contractor of any Contract Claim arising out of or related to the timeliness of the <br /> furnishing or installation of such material and Equipment. All schedules must allow for <br /> timely incorporation of any other's work under separate contract with Owner and for <br /> timely incorporation of work provided and installed by Owner. Unless otherwise <br /> expressly authorized in writing by the Owner's Representative, the Contractor must <br /> integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> d. Float in a Progress Schedule belongs to the Owner. <br /> e. Subcontractors shall review all schedules prior to submission to the Owner and Owner's <br /> Representative. At the Owner's option and sole discretion, Owner may require <br /> Contractor to obtain written acceptance of each schedule by Subcontractors as practical <br /> and feasible, as the schedule relates to Subcontractors' work. <br /> f. Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly <br /> short duration. Contractor shall use its best efforts in good faith to set reasonable <br /> durations for all activities. Contractor shall not attempt to "grab the Float" or make any <br /> effort to use any Float in the Progress Schedule for the benefit of the Contractor. <br /> g. Contractor shall submit with each Application for Payment or progress pay estimate an <br /> updated Progress Schedule, but no less often than monthly. If requested by the Owner's <br /> Representative or the Owner, Contractor shall prepare and submit updated Progress <br /> Schedules from time to time,which may be more frequent than monthly. <br /> h. The Contractor hereby expressly agrees and acknowledges that any failure by <br /> Contractor to provide accurate, complete, current and updated schedules with each and <br /> every progress pay estimate or Application for Payment constitutes a waiver of any and <br /> all claims or requests for adjustment of Contact Sum or Time that arise out of, result <br /> from, or are caused by, any Delay on the Project or scheduling of the Work. Timely <br /> submission of monthly updated schedules is a condition precedent to any later or <br /> subsequent Contract Claim or request for an adjustment of either Contract Sum or Time <br /> related to or arising out of time, an alleged Delay, or the schedule or sequence of Work. <br /> Similarly, the parties agree the Owner may withhold progress pay estimates if updated <br /> schedules are not timely submitted. These remedies are cumulative and not exclusive <br /> of any other remedy. The Owner's use of one or more of these remedies does not <br /> constitute an election or prevent the Owner from pursuing other remedies for this or <br /> other defaults. <br /> i. The Owner's Representative's review of any schedule shall not transfer any of the <br /> Contractor's responsibilities to the Owner. The Contractor alone shall remain <br /> responsible for adjusting forces, equipment, and work schedules to ensure completion <br /> THREE LAKES VALVE BYPASS July 19, 2017 1 <br /> WO#UP3611 00 72 13 -22 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.