Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 8/24/2017 9:24 <br /> Issued By NSO NIELSEN,SCOTT O. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 3/31/2016 <br /> Fund 401 Account 5 Program 710 Function 118 Activity 675 <br /> Program <br /> Title REPAIR 1 INCH 10617 WOODS CREEK RD 710118675 <br /> Work Order No 20160970 Project Activity Type SERVICE REQUEST Status CL <br /> Status 3/31/2016 Time 16:12 Original WO Billing <br /> Problem Details <br /> HOMEOWNER WOULD LIKE WATER SHUT OFF VLV AT METER REPLACED. <br /> WAS ADVISED DURING A SHOT OFF REQUEST THAT THE VALVE WAS <br /> DIFFICULT TO OPERATE AND MIGHT BE STARTING TO FAIL <br /> AND THAT HE WOULD BE RESPONSIBLE IF HE OPERATED IT HIMSELF <br /> AND IT BROKE. HOMEOWNER REQUESTS TO BE CONTACTED. <br /> Structure ID StrTVp Activity Compl Date Comments <br /> TS21875012 WASRVC YES 5/9/2016 <br /> Address 10617 WOODS CREEK RD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 10617 WOODS CREEK RD <br /> Location <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> V J0116 2013 F550 4X4 DIESEL REG CAB 8 94.4 05/09/2016 <br /> Total Vehicle Cost $94.40 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP36001147 ADAPTER 1 IPS INSTA-TITE UNION 1 37.66 05/09/2016 PAP <br /> M ADAP34145347 ADAPTER 3/4 MIP X 1 IPS INSTA-TITE 1 25.627 05/09/2016 PAP <br /> M BOX000155047 BOX METER MOLDED PLASTIC W/DI LID 15"X 27" (MEDIUM) 1 117.324 05/09/2016 PAP <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.443 05/09/2016 PAP <br /> M ELL034154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 4.995 05/09/2016 PAP <br /> M SETT38033447 SETTER COPPER 2 HEIGHT 12"NO LEG LENGTH HI/HO t 888.873 05/09/2016 PAP <br /> Total Material Cost $1,085.92 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P BRP BIGLEY, RYAN P. 8 266.808 05/09/2016 <br /> P MAR MOE,AARON R. 8 198.944 05/09/2016 <br /> Total Personnel Cost $465.75 <br /> Total Cost $1,646.07 <br />