Laserfiche WebLink
• <br /> Exhibit J: Janitorial Specifications <br /> Day(s)or month(s) Maximum Performance <br /> job to be performed performance rating: <br /> allowed Satisfactory/ <br /> Unsatisfactory <br /> Month of: <br /> 1. Spot vacuum all carpeted areas and rugs. 1. Daily,as needed 5 X WEEK S U <br /> 2. Spot dust mop all uncarpeted floors. 2. Daily,as needed 5 X WEEK S U <br /> 3. Detail Vacuum or dust mop all uncarpeted floors. 3. Per Schedule <br /> Vacuuming is to be done using appropriate floor tool. <br /> If dust mopping,use clean,treated dust mop or <br /> untreated micro fiber mop. <br /> A. Reception,entrance,lobby areas Per Schedule 5 X WEEK S U <br /> B. General office area Per Schedule 3 X WEEK S U <br /> C. Lunchroom/coffee room area. Per Schedule 3 X WEEK S U <br /> D. Restroom areas See specification#19 <br /> E. Supply/mailroom area Per Schedule 1 X WEEK S U <br /> F. Stairway/ Per Schedule 1 X WEEK S U <br /> G. Hall area Daily as needed 5 X WEEK S U <br /> G. Other To Be Determined TBD <br /> 4. Detail vacuum all carpeted areas and rugs 4. <br /> A. Reception,entrance,lobby areas Per Schedule 3 X WEEK S U <br /> B. General office area Per Schedule 1-2 X WEEK S U <br /> C. Lunchroom/coffee room area Per Schedule 5 X WEEK S U <br /> D. Supply/mailroom area Per Schedule 1 X WEEK S U <br /> E. Stairway/hall area Per Schedule 2 X WEEK S U <br /> F. Other To Be Determined TBD <br /> 5. Strip,seal and wax all tiled floors 5. Annually 1 X YEAR <br /> A. Reception, entrance,lobby areas Per Schedule Or more S U <br /> B. General office area Per Schedule often,as S U <br /> C. Lunchroom/coffee room area Per Schedule needed, S U <br /> D. Restroom areas(employee/public) Per Schedule based on S U <br /> E. Supply/mailroom area Per Schedule performance S U <br /> F. Stairway/hall area Per Schedule ratings. S U <br /> G. Other To Be Determined TBD S U <br /> 6. Machine scrub and top coat tiled floors 6. Per Schedule 2 X YEAR S U <br /> A. Reception,entrance,lobby areas Per Schedule 2 X YEAR S U <br /> B. General office area Per Schedule 2 X YEAR S U <br /> C. Lunchroom/coffee room area Per Schedule 2 X YEAR S U <br /> D. Restroom areas(employee/public) Per Schedule 2 X YEAR S U <br /> E. Supply/mailroom area Per Schedule 1 X YEAR S U <br /> F. Stairway/hall area Per Schedule 2 X YEAR S U <br /> G. Other To Be Determined TBD S U <br /> Effective Date: January 1,2006 J-5 <br />