Laserfiche WebLink
INSPECTION REPORT <br /> Date:_9 f`c _ Permit: <br /> l <br /> Contractor: 1 <br /> Owner: C,��,�v <br /> Site Address: <br /> YPE S �� <br /> ELECTRICAL n'"" MECHANICAL PLUMBING <br /> ❑Temp Service ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> oof drains ❑Building F/ (Di�nal ❑]Gas Pipe Final n HWT Final <br /> OTHER OR CONSULTATION: `�J C 1 1 <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> LP U 71-Le-)2� <br /> Inspector: Date: <br /> EIR(4/09) /C NgT_72E FORMS&PROMOTIONS 425/488-891111 <br />