My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4322 29TH DR SE 2017-09-20
>
Address Records
>
29TH DR SE
>
4322
>
4322 29TH DR SE 2017-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2017 1:53:36 PM
Creation date
9/11/2017 11:47:22 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH DR SE
Street Number
4322
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t CIcv08— 002- <br /> 1122P112- <br /> Project <br /> roject Name: I Everett River Front- Simpson_ Report: 106 <br /> GeoDesign#: I Polygon-127-01 _ Date: 8/11/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> DFR 052 PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Mostly Sunny, 60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1030/1200 <br /> Distribution: -- --- -- - --- --- <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Joe Westergreen <br /> Attachments: —m Site Plan(s) m Density Test Summary Signature: <br /> 0 Installation Records ❑ Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative,Joe Westergreen, was on-site at the request of Eddy Stevens with <br /> Polygon to observe foundation subgrade for Lots 112 and 113. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 112: <br /> GeoDesign noted that the foundation subcontractor had excavated the footing and crawl space areas for Lot 112 prior to <br /> our arrival on-site. GeoDesign noted that the exposed footing subgrade consisted of a brown-gray silty SAND (f-m) with <br /> gravel (f-c) that had been exposed using a grade blade. The exposed foundation subgrade was evaluated using a 1/2 inch <br /> diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered ranged from 1 to 2 inches and <br /> in-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than 95%of <br /> its maximum dry density as determined by a Modified Proctor analysis. A summary of our observations and density tests <br /> taken today can be found in the attached Nuclear Density Gauge Data and Figure 1. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today was currently suitable for support of <br /> the intended foundation load. GeoDesign recommends that any loose and saturated material be removed from the base of <br /> the foundation prior to the placement of concrete. <br /> Lot 113: <br /> GeoDesign noted that the foundation subcontractor had excavated the footing and crawl space areas for Lot 113 prior to <br /> our arrival using a Komatsu PC120 excavator with a grade blade. GeoDesign noted that the exposed footing subgrade <br /> consisted of a brown-gray silty SAND (f-m) with gravel (f-c). The exposed foundation subgrade was evaluated using a 1/2 <br /> inch diameter soil probe and a Troxler Moisture-Density gauge. Penetration depths encountered ranged from 1 to 2 inches <br /> and in-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than <br /> 95% of its maximum dry density as determined by a Modified Proctor analysis. A summary of our observations and density <br /> tests taken today can be found in the attached Nuclear Density Gauge Data and Figure 1. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today was currently suitable for support of <br /> the intended foundation load. GeoDesign recommends that any loose and saturated material be removed from the base of <br /> the foundation prior to the placement of concrete. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of aur representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety. This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered <br /> Final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 210 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 1 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.