Laserfiche WebLink
�h <br /> INSPECTION REPORT <br /> Date � �?,:O JW(_(Permit: C��0� 002— <br /> C7477- <br /> Contractor: <br /> 0ZContractor: <br /> Owner: <br /> q <br /> Site Address: _'+�;I2 2_ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final °�as Pipe Final ❑HWT Final <br /> —\ <br /> OTHER OR CONSULTATION: 2,1;5 —7 <br /> tP& � <br /> ❑ APPROVAL TIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED <br /> F] OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> F a � C• <br /> Y'11)a <br /> Inspector: ` J / ` / Date: > 2-3 -/ <br /> E I R(10/06) ATABAR,INC. <br />