My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4401 RIVERFRONT BLVD 2018-02-21
>
Address Records
>
RIVERFRONT BLVD
>
4401
>
4401 RIVERFRONT BLVD 2018-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 8:57:34 AM
Creation date
9/11/2017 2:24:23 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> DESiGN'Z' FIELD REPORT <br /> 1---o€3 <br /> Project Name: Everett River Front-Simpson _-- .._.... ....., Repor <br /> t 011 1 <br /> Date: 12/07/2016 <br /> GeoDesign# Polygon-1 2703 _ _____._ ___ —___.__—_- <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 30 S <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure 1145/130 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> ......... ........._.. ................ <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By- Ben Weinberg E.I.T. <br /> .............. .......... ._. . <br /> m <br /> Site Plans) m Density Test Summary Signature ry <br /> Attachments: ' <br /> ❑ Installation Records ❑ Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade for Lot 138 and 137. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 138: <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed digging the footing and crawl <br /> space area for Lot 138. GeoDesign noted that the exposed footing subgrade generally consisted of a gray-brown silty <br /> SAND (f-m)with gravel which could be penetrated less than 2 inches using a 1/2 inch diameter soil probe. <br /> Relative compaction of the exposed subgrade soils were tested using a Troxler r,Ioistiure-Density gauge. In-place density <br /> tests indicated that the material had been compacted to greater than 95% of its maximum dry density as determined by a <br /> Modified Proctor analysis. <br /> It is the opinion of GeoDesign that the exposed footing subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material be removed from the base of <br /> the footing areas prior to the placement of concrete. <br /> Lot 137: S <br /> Upon arrival, GeoDesign noted that the foundation excavation subcontractor had completed digging the footing and crawl <br /> space area for Lot 137. GeoDesign noted that the exposed footing subgrade generally consisted of a gray-brown silty <br /> SAND (f-m)with gravel which could be penetrated less than 2 inches using a 1/2 inch diameter soil probe. <br /> Relative compaction of the exposed subgrade soils were tested using a Troxler Moisture-Density gauge. In-place density <br /> tests indicated that the material had been compacted to greater than 95% of its maximum dry density as determined by a <br /> Modified Proctor analysis. <br /> It is the opinion of GeoDesign that the exposed footing subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material be removed from the base of <br /> the footing areas prior to the placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1 and Nuclear Density Gauge Data. John Feltner with <br /> Polygon was notified of our observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The reportcan only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 L..,253.203.009S <br />
The URL can be used to link to this page
Your browser does not support the video tag.