Laserfiche WebLink
INSPECTION REPORT <br /> Date --7- ZZ Permit: \ �3 l <br /> Contractor: CC:2� <br /> Owner: � _ <br /> Site Address:_`' 4OL—k___ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Grou work ❑Footing ❑Rough In ❑Rough In <br /> /Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> J&ough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ice ❑Framing ❑Rooftop Units ❑Water Service <br /> Grounding F-1Insulation ❑Mechanical Final E]Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK R T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: <br /> DATABAR,INC. <br /> E I R(10/06) <br />