My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4405 30TH DR SE 2017-09-11
>
Address Records
>
30TH DR SE
>
4405
>
4405 30TH DR SE 2017-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2017 2:34:28 PM
Creation date
9/11/2017 2:34:14 PM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR SE
Street Number
4405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C 16 10 --01 ,-7 <br /> DESIGNzu FIELD REPORT <br /> „1 Qf 3 <br /> Project Name: Everett River Front Simpson Report: 018 <br /> .... ..�_. __ .... <br /> GeoDesign#: Polygon-127-03 <br /> Date 12/29/2016 <br /> _._. — -- ---- - — <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> a <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather Cloudy, 40's <br /> -------- ._ <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure 1300/1400 <br /> Distribution: ___ -.--- <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) i <br /> ..... ......... ......... ........... ........... <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By Ben Weinberg, E.I.T. <br /> Attachments: m...._Site Plan(s) m Densis Test Summa Signature: -� <br /> Y !y_.�___ . _. <br /> __.. <br /> ❑ Installation Records El Other <br /> Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade for Lots 135 and 140. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 135: <br /> Previously, GeoDesign noted surficially loose and saturated material beneath the footing areas for Lot 135. Today, <br /> GeoDesign noted that the foundation excavation subcontractor had removed most of the surficially loose and saturated <br /> material from the base of the lot area. While on-site, GeoDesign noted a few locations with approximately 3 inches of loose <br /> saturated material which was removed with a concrete rake while on-site. Penetration depths for the exposed footing <br /> subgrade were generally less than 2 inches. <br /> It is the opinion of GeoDesign that the exposed footing subgrade is currently suitable for support of the intended structure. <br /> GeoDesign recommends that any surficially loose or saturated material that may build up under the footing area be <br /> removed prior to the placement of concrete. <br /> Lo% t 14�. <br /> viously, GeoDesign noted surficially loose and saturated material beneath the footing areas for Lot 140. Today, <br /> GeoDesign noted that the foundation excavation subcontractor had removed most of the surficially loose and saturated <br /> material from the base of the lot area. While on-site, GeoDesign noted a few locations with approximately 3 inches of loose <br /> saturated material which was removed with a concrete rake while on-site. Penetration depths for the exposed footing <br /> subgrade were generally less than 2 inches. <br /> It is the opinion of GeoDesign that the exposed footing subgrade is currently suitable for support of the intended structure. <br /> GeoDesign recommends that any surficially loose or saturated material that may build up under the footing area be <br /> removed prior to the placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1. John Feltner with Polygon was notified of our <br /> observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 l.. 253.203.0095 <br /> 7 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.