My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4413 RIVERFRONT BLVD 2018-02-21
>
Address Records
>
RIVERFRONT BLVD
>
4413
>
4413 RIVERFRONT BLVD 2018-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 9:04:27 AM
Creation date
9/11/2017 3:29:03 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4413
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGNzu FIELD REPORT <br /> 1 of 3 <br /> Project Name: ' Everett River Front-Simpson Report: 016 <br /> GeoDesign#: Polygon-127-03 — — Date: 12/22/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> 7777717777-1 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather. Cloudy,40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 0930/1000 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> .................._._._......_................................................................_............._...._.,................._...__.........................................................._..................................................................................._.-._......................_...._.........._........................-_........._..._......._..--._..__.._... <br /> Paul McKee(City of Everett) ' Dave Foster(City of Everett) Prepared By. Joe DapceviCh <br /> ..........------------_--....--.................... ....... <br /> - .....-- ----- —..---------.._ _—..—. <br /> Attachments: --- <br /> Site Plan(s) ❑ Density Test Summary Signature: ' <br /> ❑ Installation Records ❑ Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Joe Dapcevich, was on-site part time at the request of John Feltner with <br /> Polygon to observe the over-excavated subgrade backfill for Lots 135 and 140. <br /> SUMMARY of OBSERVATIONS: <br /> of 135 140: <br /> GeoDesign noted that the exposed footing subgrade for Lot 135 &140 was covered in approximately 3 to 6 inches of <br /> surficially saturated material,which we recommended be removed prior to our footing subgrade evaluation. GeoDesign <br /> observed that the footing subgrade that had been over-excavated and evaluated in the previous site visit had been lined <br /> with a non-woven geotextile fabric. Excavations were then backfilled with 2-inch clean crushed railroad ballast material <br /> and compacted into a firm and unyielding mass using the bucket of an excavator. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective ofthe presence of our representative. Dur work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials in the"Reviewed W section. <br /> 10700 Meridian Avenue North,Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 1 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.